|
No
|
1
|
| Title |
Recultivation of Mrtva Tisa (old meander) |
| Sort Description |
Releasing the river-bed bottom accumulated mud, bringing the good quality water, elimination of wastewater leaving after reparation and permanently monitoring and keeping the water ecosystem. |
| Keywords |
Dead Tisa, recultivation |
| Responsible organization or author/s |
Galus Zsolt, Kasas Sandor |
Cost (in thousand EURO)
|
10,000 |
| Possible Source |
n/a |
| Status |
Report on the research of Dead Tisa near Becej. |
| Date |
From 1972 |
| Implementing Agency |
Institute for water management Subotica |
|
No
|
2
|
| Title |
Development plan of the offers of fish-tourism; Revitalisation of natural increasing places ion River Tisa |
| Sort Description |
Adaptation of the fishing terrain, adaptation of natural increasing places on Tisa River from 164. to 132 km. Construction the fish-tourism contents. Construction the objects for congress tourism and objects for purification |
| Keywords |
Spawn, revitalisation, Tisa watershed |
| Responsible organization or author/s |
Puskas Karolj |
Cost (in thousand EURO)
|
5 |
| Possible Source |
n/a |
| Status |
2002. Revitalisation of locations for nature spawn; 2004. Revitalisation of Dead Tisa; 2005. Establishment of tourist zones. |
| Date |
2002-2012 |
| Implementing Agency |
Municipality of Kanjiza |
|
No
|
3
|
| Title |
Hydrobiological investigations of the Danube-Tisza-Danube (DTD) Canal Network with the Airnof Wise Use and Sustainable Development |
| Sort Description |
Interdisciplinary research programme include the canal network: 1. Backa; 2. North Backa; 3. South Banat with all physical, chemical, sapromicrobiological, hydrological, biochemical and toxicological analysis of water and mud. Bioindicative aspect (water quality) of biodiversity research (ichtiology, macrozoobentos. |
| Keywords |
Canals, Vojvodina, Hydrobiology, rational using, Monitoring |
| Responsible organization or author/s |
Dr Milan Matavulj |
Cost (in thousand EURO)
|
23 |
| Possible Source |
n/a |
| Status |
I phase (2002): the channels of Backa; II phase (2003): the channels of Banat |
| Date |
15.01.01-15.12.02 |
| Implementing Agency |
Faculty of Sciences of the Novi Sad University |
|
No
|
4
|
| Title |
White Stark and Heron colonies-Public information campaign |
| Sort Description |
|
| Keywords |
White Stark, Heron, colonies, protection |
| Responsible organization or author/s |
Jozef Gergej |
Cost (in thousand EURO)
|
2.8 |
| Possible Source |
n/a |
| Status |
n/a |
| Date |
1.07.01- 31.07.02 |
| Implementing Agency |
Bird Protection and Srtudy Society |
|
No
|
5
|
| Title |
Rehabilitation of the Dead Tisa near Becej |
| Sort Description |
Five years old project of Dead Tisa rehabilitation, the mud arised natural accumulating process and the other part is the result of human activities. |
| Keywords |
Becej, Dead Tisa, sanation |
| Responsible organization or author/s |
Tibor Ludmany |
Cost (in thousand EURO)
|
500 |
| Possible Source |
n/a |
| Status |
I phase: chemical analysis of water and mud; II phase: cleaning up of mud; III phase: permanent supply of depression with quality water and controlling of water quality; IV phase: making a formula of future part of Dead Tisa; V phase: reforestation and stocking with fish |
| Date |
March 2001-2006 |
| Implementing Agency |
Communal Administration of Becej in collaboration with Ecological Association Becej |
|
No
|
6
|
| Title |
Rehabilitation of the summer filling Liba and Ljutovo |
| Sort Description |
Reconstruction of summer fillings Liba and Ljutovo 20 km long for protection the 1.600 ha plough land from floods. |
| Keywords |
Landfills, floods, reconstruction |
| Responsible organization or author/s |
Dorde Trifunac |
Cost (in thousand EURO)
|
2,000 |
| Possible Source |
n/a |
| Status |
Project document is done |
| Date |
n/a |
| Implementing Agency |
Local Community Novi Becej |
|
No
|
7
|
| Title |
A port complex at industrial zone of Becej |
| Sort Description |
Construction aquatory for navigable objects, quay wall, operative coast and land part with includes manipulative spaces, objects, communication and installations. |
| Keywords |
Port, Becej, construction |
| Responsible organization or author/s |
Vladimir Dordevic |
Cost (in thousand EURO)
|
2,400 |
| Possible Source |
n/a |
| Status |
Projects are composed |
| Date |
n/a |
| Implementing Agency |
"Sojaprotein" Becej |
|
No
|
8
|
| Title |
Water supply, bringing down and purifying of wastewater at territory of Municipality of Kanjiza |
| Sort Description |
Water supply of inhabitants and industry and maintaining sewage systems as well as waste water treatment plants in the Kanjiza township with 13 residential areas |
| Keywords |
Water supply, Kanjiza |
| Responsible organization or author/s |
Vesna Markovic |
Cost (in thousand EURO)
|
2,050 |
| Possible Source |
n/a |
| Status |
I phase: distribution of water to households and industry; II phase: controlling of water quality; environmental protection. |
| Date |
2000-2008 |
| Implementing Agency |
"Potiski vodovodi" Horgos; Institute for Waterekonomy, Subotica |
|
No
|
9
|
| Title |
Forming and work of Ecological Organisations Network at Tisa River watershed |
| Sort Description |
The network of civil organisations is supposed to be qualified for continual work for expiring of information's, ideas, and co-ordinated activities. |
| Keywords |
NGO, network, publicity, communications |
| Responsible organization or author/s |
Balint Zoltan |
Cost (in thousand EURO)
|
49 |
| Possible Source |
n/a |
| Status |
Establishment of network. Capacity building of network. Functional network. |
| Date |
Long term |
| Implementing Agency |
Ecological Society Tisa Club Kanjiza |
|
No
|
10
|
| Title |
Building of the breeding farm for African catfish |
| Sort Description |
African sheath - fish can live and grow in thermal water (26-28C) We would use the existing thermal water |
| Keywords |
African sheath, fish production, geothermal water |
| Responsible organization or author/s |
Prim.dr.med. Agoston F. Ferenc |
Cost (in thousand EURO)
|
356 |
| Possible Source |
n/a |
| Status |
Project idea |
| Date |
March 2002-July 2002 |
| Implementing Agency |
n/a |
|
No
|
11
|
| Title |
Construction of the suite building "Ana" |
| Sort Description |
The planned capacity of objects in line about 41 apartment for 180-220 persons |
| Keywords |
Construction, sport, recreation, tourism |
| Responsible organization or author/s |
Prim.dr.med. Agoston F. Ferenc |
Cost (in thousand EURO)
|
1,500 |
| Possible Source |
n/a |
| Status |
Construction permission is insured, the construction of apartmans colony is started |
| Date |
March 2002-October 2002 |
| Implementing Agency |
Institute for Specialized Rehabilitation "Banja Kanjiza" |
|
No
|
12
|
| Title |
Monitoring of IBA sites in Tisza River area |
| Sort Description |
IBA is the most great international project in Europe and world. This project tend to evaluate the areas by their importance for birds; making the international registers of birds and taking an adequate steps of protection. |
| Keywords |
IBA area, birds, monitoring, Tisa watershed, protection, management |
| Responsible organization or author/s |
Mr Slobodan Puzovic |
Cost (in thousand EURO)
|
5 000 |
| Possible Source |
n/a |
| Status |
On site information collection, literature analysis, preparation of study for pahese management and improvement of the protection of international Bird Fauna and their habitats. |
| Date |
2 years |
| Implementing Agency |
The institute for NatureProtection of Srbija |
|
No
|
13
|
| Title |
Reorganization of the Old Landfill Project |
| Sort Description |
The old damp is full. There is a planning and forming of new depot. Preparing a terrain for covering with land materials from excavation for secondary sewage system. Deratization is done |
| Keywords |
Landfild, recultivation |
| Responsible organization or author/s |
Valerija Varga Futovic |
Cost (in thousand EURO)
|
244 |
| Possible Source |
n/a |
| Status |
n/a |
| Date |
n/a |
| Implementing Agency |
Communal Housing Public Company Senta |
|
No
|
14
|
| Title |
Drainage System in Senta-Main Project |
| Sort Description |
The sewage network is anticipated by regular system. A complement water amounts for hydraulic estimation are determined by watch maximum of wastewater from households and one part of industry, and by surface watersheds of atmospheric water. Network includ4es primary and secondary platoons. |
| Keywords |
Drainage, sewage, construction |
| Responsible organization or author/s |
Valerija Varga Futovic |
Cost (in thousand EURO)
|
5,593 |
| Possible Source |
n/a |
| Status |
The primary platoons of sewage system are constructed. The secondary platoons are being constructed in dependence of recouces
influx in line of 54,000 m. Construction of pump station.
|
| Date |
From 1987 |
| Implementing Agency |
Communal Housing Public Company Senta |
|
No
|
15
|
| Title |
Study about possibility of forming retention by the Tisa river bank |
| Sort Description |
Study elaborates potential retained spaces near Tisa river bank and their using in operative defence from floods. |
| Keywords |
Retention, sewage, purification |
| Responsible organization or author/s |
Valerija Varga Futovic |
Cost (in thousand EURO)
|
1,500 |
| Possible Source |
n/a |
| Status |
Done |
| Date |
From 1992 |
| Implementing Agency |
Public Enterprize JVP "Srbijavode" VPC "Dunav" |
|
No
|
16
|
| Title |
Reconstruction of Tisa landfill at widely zone of river mouth |
| Sort Description |
The only left part for reconstruction of Tisa landfill at 1% great water |
| Keywords |
Tisa, landfill,reconstru-ction |
| Responsible organization or author/s |
Mirko Golonja |
Cost
|
15,025 |
| Possible Source |
n/a |
| Status |
Not started |
| Date |
Not started |
| Implementing Agency |
Public Enterprize JVP "Srbijavode" VPC "Dunav" |
|
No
|
17
|
| Title |
Monitoring programme of Ecosystem at Tisa and Danube watersheds after the ecological pollution catastrophe of Tisa with cyanide4 and heavy metals in 2000. year. |
| Sort Description |
The Ecosystem situation with valuation for deflection of negative consequences at Tisa and Danube watersheds after the ecological pollution catastrophe of Tisa with cyanide and heavy metals in 2000. Year. |
| Keywords |
Watershed, cyanide, heavy metals, condition changes of ecosystem |
| Responsible organization or author/s |
n/a |
Cost (in thousand EURO)
|
250 |
| Possible Source |
n/a |
| Status |
The project is being done continualy for Tisa and Danube |
| Date |
n/a |
| Implementing Agency |
Public Enterprize JVP "Srbijavode" VPC "Dunav" |
|
No
|
18
|
| Title |
Yugoslavian-Hungarian water-economy co-operation |
| Sort Description |
To establish the necessity of prolonging common sector for using water, protection from water and ice and protection the water quality. |
| Keywords |
Bilateral co-operation, Yugoslavia, Hungary, water economy |
| Responsible organization or author/s |
n/a |
Cost (in thousand EURO)
|
50 |
| Possible Source |
n/a |
| Status |
The project is being done in phasees for Yugoslanvian and Hungarian teritory |
| Date |
n/a |
| Implementing Agency |
Public Enterprize JVP "Srbijavode" VPC "Dunav" |
|
No
|
19
|
| Title |
Criterions and methodologies for exchange information's about consumers of surface water and objects that leave water into water-flows. |
| Sort Description |
Marking criterions and methodology for getting and discharge water at Tisa and tributaries to analyse the ecosystem changes. |
| Keywords |
Bilateral co-operation, information's and localities, couth water and discharge water |
| Responsible organization or author/s |
n/a |
Cost (in thousand EURO)
|
20 |
| Possible Source |
n/a |
| Status |
n/a |
| Date |
24 month |
| Implementing Agency |
Public Enterprize JVP "Srbijavode" VPC "Dunav" |
|
No
|
20
|
| Title |
Common study about hydrological and hydraulic regime and quality of the Kiris river water |
| Sort Description |
Hydrological and hydraulic analysis of protection the water quality for the Kiris river revitalisation. |
| Keywords |
Bilateral co-operation, revitalisation |
| Responsible organization or author/s |
n/a |
Cost (in thousand EURO)
|
20 |
| Possible Source |
n/a |
| Status |
The project is being done in phases for Yugoslavian and Hungarian territory |
| Date |
15 months |
| Implementing Agency |
Public Enterproze JVP "Srbijavode" VPC "Dunav" |
|
No
|
21
|
| Title |
The observation methodology and potential estimation of groundwater on Yugoslavia - Hungarian boundary. |
| Sort Description |
To research and establish the balance and quality of groundwater on the state boundary area. |
| Keywords |
Bilateral co-operation, groundwater |
| Responsible organization or author/s |
n/a |
Cost (in thousand EURO)
|
50 |
| Possible Source |
n/a |
| Status |
The project is being done in phases for Yugoslavian and Hungarian territory |
| Date |
2 years |
| Implementing Agency |
Public Enterproze JVP "Srbijavode" VPC "Dunav" |
|
No
|
22
|
| Title |
Elaboration about the flood localisation and protection the Yugoslavian territory from flood of the Hungarian territory. |
| Sort Description |
The condition of construction lines for flood localisation; proportions for defence improvement from flood. |
| Keywords |
Bilateral co-operation, localisation lines floods |
| Responsible organization or author/s |
n/a |
Cost (in thousand EURO)
|
5 |
| Possible Source |
n/a |
| Status |
n/a |
| Date |
6 months |
| Implementing Agency |
Public Enterproze JVP "Srbijavode" VPC "Dunav" |
|
No
|
23
|
| Title |
The hydrotechnical characters of Tisa inland navigation from mouth to Tokaj for the Yugoslavian Tisa river. |
| Sort Description |
Making a video map and project of hydrotechnical characters for navigation needs. |
| Keywords |
Bilateral co-operation, video mapping, navigation |
| Responsible organization or author/s |
n/a |
Cost (in thousand EURO)
|
50/td>
|
| Possible Source |
n/a |
| Status |
n/a |
| Date |
2 months |
| Implementing Agency |
Public Enterproze JVP "Srbijavode" VPC "Dunav" |
|
No
|
24
|
| Title |
The co-operation programme for project of water economising. |
| Sort Description |
Making the water-economy balance of economising the water on boundary water-flows at both state territories. |
| Keywords |
Bilateral co-operation, information's water-economy balances |
| Responsible organization or author/s |
n/a |
Cost
|
200 |
| Possible Source |
n/a |
| Status |
n/a |
| Date |
2 years |
| Implementing Agency |
Public Enterproze JVP "Srbijavode" VPC "Dunav" |
|
No
|
25
|
| Title |
Realisation of general co-operation programme in area of groundwater. |
| Sort Description |
To research and establish the balance and quality of groundwater on the state boundary area. |
| Keywords |
Bilateral co-operation, ground water |
| Responsible organization or author/s |
n/a |
Cost (in thousand EURO)
|
80 |
| Possible Source |
n/a |
| Status |
Phases by programmes |
| Date |
2 years |
| Implementing Agency |
Public Enterproze JVP "Srbijavode" VPC "Dunav" |
|
No
|
26
|
| Title |
The function of Zlatica System |
| Sort Description |
Optimal function of Zlatica System |
| Keywords |
Bilateral co-operation, quality, quantity, water, defence, floods |
| Responsible organization or author/s |
n/a |
Cost (in thousand EURO)
|
100 |
| Possible Source |
n/a |
| Status |
The project is being done in phases for Yugoslavisan and Hungarian territory. |
| Date |
12 months |
| Implementing Agency |
Public Enterproze JVP "Srbijavode" VPC "Dunav" |
|
No
|
27
|
| Title |
Revitalisation of Plovni Begej channel (Yugoslavia - Romanian hydrotechnical co-operation) |
| Sort Description |
To establish the economic justifiableness of Plovni Begej channel revitalisation and making the possibility of navigation the ships 1.000 t weight. |
| Keywords |
Bilateral co-operation, common sector |
| Responsible organization or author/s |
n/a |
Cost (in thousand EURO)
|
200 |
| Possible Source |
n/a |
| Status |
The project is beign done in phases for Yugoslavian and Romanian territory. |
| Date |
12 months |
| Implementing Agency |
Public Enterproze JVP "Srbijavode" VPC "Dunav" |
|
No
|
28
|
| Title |
The complex solution of the Plovni Begej channel revitalisation include the study about the water economising at Begej -Tamis watershed. |
| Sort Description |
Making an optimal solution of water economising at Tamis and Begej watersheds which are extended on both state territories. |
| Keywords |
Overboundary influence, defence from floods, Tamis, canal Begej |
| Responsible organization or author/s |
n/a |
Cost (in thousand EURO)
|
150 |
| Possible Source |
n/a |
| Status |
n/a |
| Date |
2002-2004 |
| Implementing Agency |
Public Enterproze JVP "Srbijavode" VPC "Dunav" |
|
No
|
29
|
| Title |
Project of reconstruction the primary channel of "Horgos - Martonos" watershed. |
| Sort Description |
Reconstruction the primary channel of Horgos - Martonos watershed in unity with common Yugoslavian and Hungarian riles of the primary channel function. |
| Keywords |
Drainage, defence from internal water, international co-operation |
| Responsible organization or author/s |
Nikola Buncic |
Cost (in thousand EURO)
|
1,000 |
| Possible Source |
n/a |
| Status |
n/a |
| Date |
Long term |
| Implementing Agency |
Public Enterproze JVP "Srbijavode" VPC "Dunav" |
|
No
|
30
|
| Title |
Research studies of macrophyte vegetation in the Tisa river. |
| Sort Description |
To establish the condition of water vascular macrofytes, the conditions of growth (hydrological, hydritechnical, hydromorphological, hydrobiological) analysis of flora, vegetation, sediment, indication, references. |
| Keywords |
Phytoplankton, Zooplankton, Macrofytes, floristic analysis |
| Responsible organization or author/s |
n/a |
Cost (in thousand EURO)
|
20 |
| Possible Source |
n/a |
| Status |
The exploration of Martonos-Senta part is done; Senta-Becej in plan in 2002. Godine.III phase: Nivi Becej-Danube )mouth) in plan in 2003. Godine. |
| Date |
Long term |
| Implementing Agency |
Public Enterproze JVP "Srbijavode" VPC "Dunav" |
|
No
|
31
|
| Title |
Interstate distribution of water recourses at Tisa river watershed |
| Sort Description |
The watereconomy balance is determined by: 1. Available water )the quality and quantity(), 2. Requirements for water (by quality and quantity), at present and planed future terms. |
| Keywords |
Water, distribution, study |
| Responsible organization or author/s |
Vladimir Ciric |
Cost (in thousand EURO)
|
n/a |
| Possible Source |
n/a |
| Status |
1.Water balance like a special project; 2. Watereconomy balances of states; 3. There is an agreement of water distribution among the states of watershed. |
| Date |
n/a |
| Implementing Agency |
Public Enterproze JVP "Srbijavode" VPC "Dunav" |
|
No
|
32
|
| Title |
The Gasification of Becej |
| Sort Description |
Project includes building of medial pressure canalworks long 12.000 m, 3 MRS capacity 3.000 Sm3/h and 200 km of street network of low pressure and 2.655 home annexations. |
| Keywords |
Gadsification, economy, clean air |
| Responsible organization or author/s |
Radoslav Ivanovic |
Cost (in thousand EURO)
|
2,811 |
| Possible Source |
n/a |
| Status |
1. The gas canalworks of medial pressure; 2. Measure-regulated stations; 3. Street network of low pressure; 4. Home annexes |
| Date |
2002-2005 |
| Implementing Agency |
Public corporation for the production and delivery of thermal energy "Thermal Plant" Becej |
|
No
|
33
|
| Title |
Technological, mechanical and Electro project for equipment for wastewater treatment from operation of surface protection |
| Sort Description |
Automatic system for primary wastewater treatment from operation of surface protection: chemical reduction, neutralisation, accumulation and filtering of accumulated mud. |
| Keywords |
Project, technology, chemical purifing, hydroxids sedimentation |
| Responsible organization or author/s |
Tasin Nestor |
Cost (in thousand EURO)
|
150,000 |
| Possible Source |
n/a |
| Status |
n/a |
| Date |
2000-2003 |
| Implementing Agency |
"Fadip-Galop-Galvan equipment and service |
|
No
|
34
|
| Title |
Windbreak forest belst on the territory of Becej community |
| Sort Description |
Planting of plants in areas by the road and water-flow for land protection from erosion activity of wind, especially by AIC Becej. |
| Keywords |
Wind, erosion, land trees |
| Responsible organization or author/s |
Petar Momcilovic |
Cost (in thousand EURO)
|
3,700,000 |
| Possible Source |
n/a |
| Status |
The terrain preparing, preparing of plants, atendance and maintancem, planting |
| Date |
1999-2005 |
| Implementing Agency |
AIC Becej Agriculture AD |
|
No
|
35
|
| Title |
Soil-amelioration and preparation for orchard |
| Sort Description |
Physical preparing of parcels, forming a configuration, pedoamelioration working and construction works for preparing of water regime and road network. |
| Keywords |
0Leveling, covering with sand |
| Responsible organization or author/s |
Molnar Endre |
Cost (in thousand EURO)
|
320,000 |
| Possible Source |
n/a |
| Status |
I 24 ha; II 24 ha; III 20 ha |
| Date |
2002-2007 |
| Implementing Agency |
AIC Becej Agriculture AD |
|
No
|
36
|
| Title |
Arrangement of the complex of "Simicev" Ranch |
| Sort Description |
To save the existing memorial complex and its translating into picnic land |
| Keywords |
Picnic land, wood, recreation |
| Responsible organization or author/s |
Ljijana Milekic |
Cost (in thousand EURO)
|
20,000 |
| Possible Source |
n/a |
| Status |
Project dev., feasibility study and implementation |
| Date |
2002-2005 |
| Implementing Agency |
Municipality of Kikinda |
|
No
|
37
|
| Title |
Arrangement of the complex of the grassland of Otis Tarda |
| Sort Description |
Protection and arrangement of the complex of grassland of Otis Tarda, protection of birds and construction of temporary object. |
| Keywords |
Arrangement, grassland, Otis Tarda |
| Responsible organization or author/s |
Vladimir Jovanovic |
Cost (in thousand EURO)
|
n/a |
| Possible Source |
n/a |
| Status |
Verification of protected natural part, programs verified by country Institute for Natural Protection, and with country Institute for Natural Protection |
| Date |
2002-2005 |
| Implementing Agency |
Municipality of Kikinda |
|
No
|
38
|
| Title |
Education in Daycare centres and schools |
| Sort Description |
Education of children tends to make an adequate relation to environment, protection and improvement |
| Keywords |
Children, nature,plants |
| Responsible organization or author/s |
Ljijana Milekic |
Cost (in thousand EURO)
|
15,000 |
| Possible Source |
n/a |
| Status |
educating experts, children, verification of science work |
| Date |
2002-2004 |
| Implementing Agency |
Municipality of Kikinda |
|
No
|
39
|
| Title |
"Stevanceva" pool part of the Center for Sport Culture "Jezero" |
| Sort Description |
Hydrootechnical solution of old lake "Stevanceva" pool, improvement of the all complex. |
| Keywords |
Recreative zone, lake, easy recreation |
| Responsible organization or author/s |
Slavoljub Ludajic |
Cost (in thousand EURO)
|
n/a |
| Possible Source |
n/a |
| Status |
Hydrotechnical solution, technical documentation, realisation |
| Date |
1993-2005 |
| Implementing Agency |
Municipality of Kikinda |