FOOD AND AGRICULTURE ORGANIZATION
OF THE UNITED NATIONS

   

Sub-regional Office
for Central and Eastern Europe (SEUR)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Seminar on Integrated Water Management in the Tisza River Basin
Final Report XVIII


List of Projects / National key interests of the five Tisza countries


Serbia-Montenegro

No
1
Title Recultivation of Mrtva Tisa (old meander)
Sort Description Releasing the river-bed bottom accumulated mud, bringing the good quality water, elimination of wastewater leaving after reparation and permanently monitoring and keeping the water ecosystem.
Keywords Dead Tisa, recultivation
Responsible organization or author/s Galus Zsolt, Kasas Sandor
Cost (in thousand EURO)
10,000
Possible Source n/a
Status Report on the research of Dead Tisa near Becej.
Date From 1972
Implementing Agency Institute for water management Subotica
No
2
Title Development plan of the offers of fish-tourism; Revitalisation of natural increasing places ion River Tisa
Sort Description Adaptation of the fishing terrain, adaptation of natural increasing places on Tisa River from 164. to 132 km. Construction the fish-tourism contents. Construction the objects for congress tourism and objects for purification
Keywords Spawn, revitalisation, Tisa watershed
Responsible organization or author/s Puskas Karolj
Cost (in thousand EURO)
5
Possible Source n/a
Status 2002. Revitalisation of locations for nature spawn; 2004. Revitalisation of Dead Tisa; 2005. Establishment of tourist zones.
Date 2002-2012
Implementing Agency Municipality of Kanjiza
No
3
Title Hydrobiological investigations of the Danube-Tisza-Danube (DTD) Canal Network with the Airnof Wise Use and Sustainable Development
Sort Description Interdisciplinary research programme include the canal network: 1. Backa; 2. North Backa; 3. South Banat with all physical, chemical, sapromicrobiological, hydrological, biochemical and toxicological analysis of water and mud. Bioindicative aspect (water quality) of biodiversity research (ichtiology, macrozoobentos.
Keywords Canals, Vojvodina, Hydrobiology, rational using, Monitoring
Responsible organization or author/s Dr Milan Matavulj
Cost (in thousand EURO)
23
Possible Source n/a
Status I phase (2002): the channels of Backa; II phase (2003): the channels of Banat
Date 15.01.01-15.12.02
Implementing Agency Faculty of Sciences of the Novi Sad University
No
4
Title White Stark and Heron colonies-Public information campaign
Sort Description
Keywords White Stark, Heron, colonies, protection
Responsible organization or author/s Jozef Gergej
Cost (in thousand EURO)
2.8
Possible Source n/a
Status n/a
Date 1.07.01- 31.07.02
Implementing Agency Bird Protection and Srtudy Society
No
5
Title Rehabilitation of the Dead Tisa near Becej
Sort Description Five years old project of Dead Tisa rehabilitation, the mud arised natural accumulating process and the other part is the result of human activities.
Keywords Becej, Dead Tisa, sanation
Responsible organization or author/s Tibor Ludmany
Cost (in thousand EURO)
500
Possible Source n/a
Status I phase: chemical analysis of water and mud; II phase: cleaning up of mud; III phase: permanent supply of depression with quality water and controlling of water quality; IV phase: making a formula of future part of Dead Tisa; V phase: reforestation and stocking with fish
Date March 2001-2006
Implementing Agency Communal Administration of Becej in collaboration with Ecological Association Becej
No
6
Title Rehabilitation of the summer filling Liba and Ljutovo
Sort Description Reconstruction of summer fillings Liba and Ljutovo 20 km long for protection the 1.600 ha plough land from floods.
Keywords Landfills, floods, reconstruction
Responsible organization or author/s Dorde Trifunac
Cost (in thousand EURO)
2,000
Possible Source n/a
Status Project document is done
Date n/a
Implementing Agency Local Community Novi Becej
No
7
Title A port complex at industrial zone of Becej
Sort Description Construction aquatory for navigable objects, quay wall, operative coast and land part with includes manipulative spaces, objects, communication and installations.
Keywords Port, Becej, construction
Responsible organization or author/s Vladimir Dordevic
Cost (in thousand EURO)
2,400
Possible Source n/a
Status Projects are composed
Date n/a
Implementing Agency "Sojaprotein" Becej
No
8
Title Water supply, bringing down and purifying of wastewater at territory of Municipality of Kanjiza
Sort Description Water supply of inhabitants and industry and maintaining sewage systems as well as waste water treatment plants in the Kanjiza township with 13 residential areas
Keywords Water supply, Kanjiza
Responsible organization or author/s Vesna Markovic
Cost (in thousand EURO)
2,050
Possible Source n/a
Status I phase: distribution of water to households and industry; II phase: controlling of water quality; environmental protection.
Date 2000-2008
Implementing Agency "Potiski vodovodi" Horgos; Institute for Waterekonomy, Subotica
No
9
Title Forming and work of Ecological Organisations Network at Tisa River watershed
Sort Description The network of civil organisations is supposed to be qualified for continual work for expiring of information's, ideas, and co-ordinated activities.
Keywords NGO, network, publicity, communications
Responsible organization or author/s Balint Zoltan
Cost (in thousand EURO)
49
Possible Source n/a
Status Establishment of network. Capacity building of network. Functional network.
Date Long term
Implementing Agency Ecological Society Tisa Club Kanjiza
No
10
Title Building of the breeding farm for African catfish
Sort Description African sheath - fish can live and grow in thermal water (26-28C) We would use the existing thermal water
Keywords African sheath, fish production, geothermal water
Responsible organization or author/s Prim.dr.med. Agoston F. Ferenc
Cost (in thousand EURO)
356
Possible Source n/a
Status Project idea
Date March 2002-July 2002
Implementing Agency n/a
No
11
Title Construction of the suite building "Ana"
Sort Description The planned capacity of objects in line about 41 apartment for 180-220 persons
Keywords Construction, sport, recreation, tourism
Responsible organization or author/s Prim.dr.med. Agoston F. Ferenc
Cost (in thousand EURO)
1,500
Possible Source n/a
Status Construction permission is insured, the construction of apartmans colony is started
Date March 2002-October 2002
Implementing Agency Institute for Specialized Rehabilitation "Banja Kanjiza"
No
12
Title Monitoring of IBA sites in Tisza River area
Sort Description IBA is the most great international project in Europe and world. This project tend to evaluate the areas by their importance for birds; making the international registers of birds and taking an adequate steps of protection.
Keywords IBA area, birds, monitoring, Tisa watershed, protection, management
Responsible organization or author/s Mr Slobodan Puzovic
Cost (in thousand EURO)
5 000
Possible Source n/a
Status On site information collection, literature analysis, preparation of study for pahese management and improvement of the protection of international Bird Fauna and their habitats.
Date 2 years
Implementing Agency The institute for NatureProtection of Srbija
No
13
Title Reorganization of the Old Landfill Project
Sort Description The old damp is full. There is a planning and forming of new depot. Preparing a terrain for covering with land materials from excavation for secondary sewage system. Deratization is done
Keywords Landfild, recultivation
Responsible organization or author/s Valerija Varga Futovic
Cost (in thousand EURO)
244
Possible Source n/a
Status n/a
Date n/a
Implementing Agency Communal Housing Public Company Senta
No
14
Title Drainage System in Senta-Main Project
Sort Description The sewage network is anticipated by regular system. A complement water amounts for hydraulic estimation are determined by watch maximum of wastewater from households and one part of industry, and by surface watersheds of atmospheric water. Network includ4es primary and secondary platoons.
Keywords Drainage, sewage, construction
Responsible organization or author/s Valerija Varga Futovic
Cost (in thousand EURO)
5,593
Possible Source n/a
Status The primary platoons of sewage system are constructed. The secondary platoons are being constructed in dependence of recouces influx in line of 54,000 m. Construction of pump station.
Date From 1987
Implementing Agency Communal Housing Public Company Senta
No
15
Title Study about possibility of forming retention by the Tisa river bank
Sort Description Study elaborates potential retained spaces near Tisa river bank and their using in operative defence from floods.
Keywords Retention, sewage, purification
Responsible organization or author/s Valerija Varga Futovic
Cost (in thousand EURO)
1,500
Possible Source n/a
Status Done
Date From 1992
Implementing Agency Public Enterprize JVP "Srbijavode" VPC "Dunav"
No
16
Title Reconstruction of Tisa landfill at widely zone of river mouth
Sort Description The only left part for reconstruction of Tisa landfill at 1% great water
Keywords Tisa, landfill,reconstru-ction
Responsible organization or author/s Mirko Golonja
Cost
15,025
Possible Source n/a
Status Not started
Date Not started
Implementing Agency Public Enterprize JVP "Srbijavode" VPC "Dunav"
No
17
Title Monitoring programme of Ecosystem at Tisa and Danube watersheds after the ecological pollution catastrophe of Tisa with cyanide4 and heavy metals in 2000. year.
Sort Description The Ecosystem situation with valuation for deflection of negative consequences at Tisa and Danube watersheds after the ecological pollution catastrophe of Tisa with cyanide and heavy metals in 2000. Year.
Keywords Watershed, cyanide, heavy metals, condition changes of ecosystem
Responsible organization or author/s n/a
Cost (in thousand EURO)
250
Possible Source n/a
Status The project is being done continualy for Tisa and Danube
Date n/a
Implementing Agency Public Enterprize JVP "Srbijavode" VPC "Dunav"
No
18
Title Yugoslavian-Hungarian water-economy co-operation
Sort Description To establish the necessity of prolonging common sector for using water, protection from water and ice and protection the water quality.
Keywords Bilateral co-operation, Yugoslavia, Hungary, water economy
Responsible organization or author/s n/a
Cost (in thousand EURO)
50
Possible Source n/a
Status The project is being done in phasees for Yugoslanvian and Hungarian teritory
Date n/a
Implementing Agency Public Enterprize JVP "Srbijavode" VPC "Dunav"
No
19
Title Criterions and methodologies for exchange information's about consumers of surface water and objects that leave water into water-flows.
Sort Description Marking criterions and methodology for getting and discharge water at Tisa and tributaries to analyse the ecosystem changes.
Keywords Bilateral co-operation, information's and localities, couth water and discharge water
Responsible organization or author/s n/a
Cost (in thousand EURO)
20
Possible Source n/a
Status n/a
Date 24 month
Implementing Agency Public Enterprize JVP "Srbijavode" VPC "Dunav"
No
20
Title Common study about hydrological and hydraulic regime and quality of the Kiris river water
Sort Description Hydrological and hydraulic analysis of protection the water quality for the Kiris river revitalisation.
Keywords Bilateral co-operation, revitalisation
Responsible organization or author/s n/a
Cost (in thousand EURO)
20
Possible Source n/a
Status The project is being done in phases for Yugoslavian and Hungarian territory
Date 15 months
Implementing Agency Public Enterproze JVP "Srbijavode" VPC "Dunav"
No
21
Title The observation methodology and potential estimation of groundwater on Yugoslavia - Hungarian boundary.
Sort Description To research and establish the balance and quality of groundwater on the state boundary area.
Keywords Bilateral co-operation, groundwater
Responsible organization or author/s n/a
Cost (in thousand EURO)
50
Possible Source n/a
Status The project is being done in phases for Yugoslavian and Hungarian territory
Date 2 years
Implementing Agency Public Enterproze JVP "Srbijavode" VPC "Dunav"
No
22
Title Elaboration about the flood localisation and protection the Yugoslavian territory from flood of the Hungarian territory.
Sort Description The condition of construction lines for flood localisation; proportions for defence improvement from flood.
Keywords Bilateral co-operation, localisation lines floods
Responsible organization or author/s n/a
Cost (in thousand EURO)
5
Possible Source n/a
Status n/a
Date 6 months
Implementing Agency Public Enterproze JVP "Srbijavode" VPC "Dunav"
No
23
Title The hydrotechnical characters of Tisa inland navigation from mouth to Tokaj for the Yugoslavian Tisa river.
Sort Description Making a video map and project of hydrotechnical characters for navigation needs.
Keywords Bilateral co-operation, video mapping, navigation
Responsible organization or author/s n/a
Cost (in thousand EURO)
50/td>
Possible Source n/a
Status n/a
Date 2 months
Implementing Agency Public Enterproze JVP "Srbijavode" VPC "Dunav"
No
24
Title The co-operation programme for project of water economising.
Sort Description Making the water-economy balance of economising the water on boundary water-flows at both state territories.
Keywords Bilateral co-operation, information's water-economy balances
Responsible organization or author/s n/a
Cost
200
Possible Source n/a
Status n/a
Date 2 years
Implementing Agency Public Enterproze JVP "Srbijavode" VPC "Dunav"
No
25
Title Realisation of general co-operation programme in area of groundwater.
Sort Description To research and establish the balance and quality of groundwater on the state boundary area.
Keywords Bilateral co-operation, ground water
Responsible organization or author/s n/a
Cost (in thousand EURO)
80
Possible Source n/a
Status Phases by programmes
Date 2 years
Implementing Agency Public Enterproze JVP "Srbijavode" VPC "Dunav"
No
26
Title The function of Zlatica System
Sort Description Optimal function of Zlatica System
Keywords Bilateral co-operation, quality, quantity, water, defence, floods
Responsible organization or author/s n/a
Cost (in thousand EURO)
100
Possible Source n/a
Status The project is being done in phases for Yugoslavisan and Hungarian territory.
Date 12 months
Implementing Agency Public Enterproze JVP "Srbijavode" VPC "Dunav"
No
27
Title Revitalisation of Plovni Begej channel (Yugoslavia - Romanian hydrotechnical co-operation)
Sort Description To establish the economic justifiableness of Plovni Begej channel revitalisation and making the possibility of navigation the ships 1.000 t weight.
Keywords Bilateral co-operation, common sector
Responsible organization or author/s n/a
Cost (in thousand EURO)
200
Possible Source n/a
Status The project is beign done in phases for Yugoslavian and Romanian territory.
Date 12 months
Implementing Agency Public Enterproze JVP "Srbijavode" VPC "Dunav"
No
28
Title The complex solution of the Plovni Begej channel revitalisation include the study about the water economising at Begej -Tamis watershed.
Sort Description Making an optimal solution of water economising at Tamis and Begej watersheds which are extended on both state territories.
Keywords Overboundary influence, defence from floods, Tamis, canal Begej
Responsible organization or author/s n/a
Cost (in thousand EURO)
150
Possible Source n/a
Status n/a
Date 2002-2004
Implementing Agency Public Enterproze JVP "Srbijavode" VPC "Dunav"
No
29
Title Project of reconstruction the primary channel of "Horgos - Martonos" watershed.
Sort Description Reconstruction the primary channel of Horgos - Martonos watershed in unity with common Yugoslavian and Hungarian riles of the primary channel function.
Keywords Drainage, defence from internal water, international co-operation
Responsible organization or author/s Nikola Buncic
Cost (in thousand EURO)
1,000
Possible Source n/a
Status n/a
Date Long term
Implementing Agency Public Enterproze JVP "Srbijavode" VPC "Dunav"
No
30
Title Research studies of macrophyte vegetation in the Tisa river.
Sort Description To establish the condition of water vascular macrofytes, the conditions of growth (hydrological, hydritechnical, hydromorphological, hydrobiological) analysis of flora, vegetation, sediment, indication, references.
Keywords Phytoplankton, Zooplankton, Macrofytes, floristic analysis
Responsible organization or author/s n/a
Cost (in thousand EURO)
20
Possible Source n/a
Status The exploration of Martonos-Senta part is done; Senta-Becej in plan in 2002. Godine.III phase: Nivi Becej-Danube )mouth) in plan in 2003. Godine.
Date Long term
Implementing Agency Public Enterproze JVP "Srbijavode" VPC "Dunav"
No
31
Title Interstate distribution of water recourses at Tisa river watershed
Sort Description The watereconomy balance is determined by: 1. Available water )the quality and quantity(), 2. Requirements for water (by quality and quantity), at present and planed future terms.
Keywords Water, distribution, study
Responsible organization or author/s Vladimir Ciric
Cost (in thousand EURO)
n/a
Possible Source n/a
Status 1.Water balance like a special project; 2. Watereconomy balances of states; 3. There is an agreement of water distribution among the states of watershed.
Date n/a
Implementing Agency Public Enterproze JVP "Srbijavode" VPC "Dunav"
No
32
Title The Gasification of Becej
Sort Description Project includes building of medial pressure canalworks long 12.000 m, 3 MRS capacity 3.000 Sm3/h and 200 km of street network of low pressure and 2.655 home annexations.
Keywords Gadsification, economy, clean air
Responsible organization or author/s Radoslav Ivanovic
Cost (in thousand EURO)
2,811
Possible Source n/a
Status 1. The gas canalworks of medial pressure; 2. Measure-regulated stations; 3. Street network of low pressure; 4. Home annexes
Date 2002-2005
Implementing Agency Public corporation for the production and delivery of thermal energy "Thermal Plant" Becej
No
33
Title Technological, mechanical and Electro project for equipment for wastewater treatment from operation of surface protection
Sort Description Automatic system for primary wastewater treatment from operation of surface protection: chemical reduction, neutralisation, accumulation and filtering of accumulated mud.
Keywords Project, technology, chemical purifing, hydroxids sedimentation
Responsible organization or author/s Tasin Nestor
Cost (in thousand EURO)
150,000
Possible Source n/a
Status n/a
Date 2000-2003
Implementing Agency "Fadip-Galop-Galvan equipment and service
No
34
Title Windbreak forest belst on the territory of Becej community
Sort Description Planting of plants in areas by the road and water-flow for land protection from erosion activity of wind, especially by AIC Becej.
Keywords Wind, erosion, land trees
Responsible organization or author/s Petar Momcilovic
Cost (in thousand EURO)
3,700,000
Possible Source n/a
Status The terrain preparing, preparing of plants, atendance and maintancem, planting
Date 1999-2005
Implementing Agency AIC Becej Agriculture AD
No
35
Title Soil-amelioration and preparation for orchard
Sort Description Physical preparing of parcels, forming a configuration, pedoamelioration working and construction works for preparing of water regime and road network.
Keywords 0Leveling, covering with sand
Responsible organization or author/s Molnar Endre
Cost (in thousand EURO)
320,000
Possible Source n/a
Status I 24 ha; II 24 ha; III 20 ha
Date 2002-2007
Implementing Agency AIC Becej Agriculture AD
No
36
Title Arrangement of the complex of "Simicev" Ranch
Sort Description To save the existing memorial complex and its translating into picnic land
Keywords Picnic land, wood, recreation
Responsible organization or author/s Ljijana Milekic
Cost (in thousand EURO)
20,000
Possible Source n/a
Status Project dev., feasibility study and implementation
Date 2002-2005
Implementing Agency Municipality of Kikinda
No
37
Title Arrangement of the complex of the grassland of Otis Tarda
Sort Description Protection and arrangement of the complex of grassland of Otis Tarda, protection of birds and construction of temporary object.
Keywords Arrangement, grassland, Otis Tarda
Responsible organization or author/s Vladimir Jovanovic
Cost (in thousand EURO)
n/a
Possible Source n/a
Status Verification of protected natural part, programs verified by country Institute for Natural Protection, and with country Institute for Natural Protection
Date 2002-2005
Implementing Agency Municipality of Kikinda
No
38
Title Education in Daycare centres and schools
Sort Description Education of children tends to make an adequate relation to environment, protection and improvement
Keywords Children, nature,plants
Responsible organization or author/s Ljijana Milekic
Cost (in thousand EURO)
15,000
Possible Source n/a
Status educating experts, children, verification of science work
Date 2002-2004
Implementing Agency Municipality of Kikinda
No
39
Title "Stevanceva" pool part of the Center for Sport Culture "Jezero"
Sort Description Hydrootechnical solution of old lake "Stevanceva" pool, improvement of the all complex.
Keywords Recreative zone, lake, easy recreation
Responsible organization or author/s Slavoljub Ludajic
Cost (in thousand EURO)
n/a
Possible Source n/a
Status Hydrotechnical solution, technical documentation, realisation
Date 1993-2005
Implementing Agency Municipality of Kikinda


Next

    Comments? Questions? Ask FAO