Annex 1
Organisational Chart
Annex 2
RECORD KEEPING FORMS USED FOR TIGER SHRIMP CULTURE COMPONENT OF SADP
BANGLADESH SECOND AQUACULTURE DEVELOPMENT PROJECT ASIAN DEVELOPMENT LOAN NO. 821-(SF)
ANNEX 2 (1 OF 12)
POND RECORD BOOK (1996)
Bagda Pond Record Book
Shrimp Farmers introduction
Name: ..............................................................................................................
Union: ..............................................................................................................
Thana: ..............................................................................................................
District: ............................................................................................................
Demonstration Pond No.: ..................................................................................
Demopond area (ha): .........................................................................................
Length (m) ......................................... Width (m) .............................................
This Record Book has 9 Forms and one page containing schedule of recording information. Each form must be accurately filled in. In the Record Book supplied to the Thana Fishery Officers and demonstration farmers, necessary copies of each form were included.
ANNEX - 2 (2 OF 12)
FORM - 1.
PRE-STOCKING POND PREPARATION AND FRY STOCKING FORM
Pond
preparation: | From |
To | ||||
|
| |||||
Pond
drying date: | From (month) ..............
To (month) .............. | |||||
| | |||||
Previous crop type ( ) |
From (month) .............. To (month) .............. | |||||
|
| |||||
Poisoning
................................Date: |
| |||||
|
| |||||
Kind: |
Quantity: | Cost: | ||||
|
| |||||
Lime: |
Date: | | ||||
|
| |||||
Kind: |
Quantity: | Cost: | ||||
|
| |||||
Screen |
Date: | | ||||
|
| |||||
Screen
mesh: | Quantity: |
Cost: | ||||
| | |||||
Pond filling: |
Starting date | Complete
date: | ||||
|
| |||||
Fertiliser
application: | | |||||
Kind |
Date: | | ||||
|
Quantity: | | ||||
Kind |
Date: | | ||||
|
Quantity: | Cost: | ||||
Others: |
Cost: | |||||
Total preparation: | Cost: | |||||
|
| |||||
|
| |||||
Bagda
fry stocking record: | | |||||
Date |
Av. length (mm) | Fry number |
Price | Stocking % complete | ||
|
| |
| | ||
|
| |
| | ||
|
| |
| | ||
|
| |
| | ||
|
| |
| | ||
|
| |
| | ||
|
| |
| | ||
|
| |
| | ||
|
| |
| | ||
|
| |
| | ||
|
| |
| | ||
|
| |
| | ||
|
| |
| | ||
|
| |
| | ||
TOTAL |
| |
| |
ANNEX 2 (3 OF 12)
SCHEDULE OF RECORDING INFORMATION
1. SECCHI DISC READING: 12.00 - 13.00 hrs.
2. WATER DEPTH: Any time of the day; Just before and after the water exchange cycle.
3. WATER SALINITY: As for water depth
4. WATER TEMPERATURE: Once before sunrise and once at 4 p.m.
5. WATER pH: At sunrise and at sunset.
6. DISSOLVED OXYGEN: Before sunrise and at sunset.
7. SHRIMP WEEKLY GROWTH: Morning or late afternoon.
8. ZOOPLANKTON: Any time of the day.
9. WATCH SHRIMP BEHAVIOUR:
FOR DISEASE: During growth sampling; Any time of the day.FOR OXYGEN DIFICIENCY: Early morning.
FOR HIGH TEMPERATURE: Noon - afternoon.
ANNEX - 2 (4 OF 12)
FORM NO. 2
SCIENTIFIC DATA RECORD FORM
Date | Secchi
dise reading | Water exchange |
Water | Shrimp
av. growth | Fertiliser |
Others | |||||||
English |
Moon |
(cm) |
% | Depth |
Temp. |
pH | D.
O. | Salinity |
Size |
Weight |
Urea |
TSP | |
| 28 |
+ | + |
+ | + |
+ | + |
+ | |
| |
| |
|
29 | |
+ | |
| |
| |
| |
| |
|
|
30 | |
+ | |
| |
| |
| |
| |
|
|
1 | |
+ | |
| |
| |
+ | + |
| |
|
|
2 | |
+ | |
| |
| |
| |
| |
|
|
3 | |
| + |
+ | + |
+ | + |
| |
| |
|
|
7 | + |
| |
| |
| |
+ | + |
| |
|
|
12 | + |
| + |
+ | + |
+ | + |
| |
| |
|
|
13 | |
+ | |
| |
| |
| |
| |
|
|
14 | |
+ | |
| |
| |
| |
| |
|
|
15 | |
+ | |
| |
| |
+ | + |
| |
|
|
16 | |
+ | |
| |
| |
| |
| |
|
|
17 | |
+ | + |
+ | + |
+ | + |
| |
| |
|
|
22 | + |
| |
| |
| |
+ | + |
| |
|
|
28 | |
+ | + |
+ | + |
+ | + |
| |
| |
|
|
29 | |
+ | |
| |
| |
+ | + |
| |
|
|
30 | |
+ | + |
| |
| |
| |
| |
|
|
1 | |
+ | |
| |
| |
| |
| |
|
|
2 | |
+ | |
| |
| |
| |
| |
|
|
3 | |
| + |
+ | + |
+ | + |
| |
| |
|
|
7 | + |
| |
| |
| |
+ | + |
| |
|
|
12 | + |
| + |
+ | + |
+ | + |
| |
| |
|
|
13 | |
+ | |
| |
| |
| |
| |
|
|
14 | |
+ | |
| |
| |
| |
| |
|
|
15 | |
+ | |
| |
| |
+ | + |
| |
|
|
16 | |
+ | |
| |
| |
| |
| |
|
|
17 | |
+ | + |
+ | + |
+ | + |
| |
| |
|
|
22 | + |
| |
| |
| |
+ | + |
| |
|
|
28 | |
+ | + |
+ | + |
+ | + |
| |
| |
|
ANNEX - 2 (5 OF 12)
Form No. 3
MONTHLY FEED SUPPLY AND PUMPING DATA
Month___________________________
Date |
Rice/Wheat bran | Mastered
oil cake | Feed (Pellet) |
Total Feed | Pumping
Cost | Total Cost | ||||||
Kg. |
Price | Kg. |
Price | Kg. |
Price | Kg. |
Price | Rent |
Fuel | (Taka) | ||
|
| |
| |
| |
| |
| Litre |
Taka | |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
ANNEX - 2 (6 OF 12)
FORM NO. 4
DAILY
HARVESTING INFORMATION (MONTH-WISE)
(Shrimp)
Month |
P. monodon | M.
rosenbergii | P. indicus |
M. monoceros | Other
Shrimp | Total Shrimp | ||||||
Kg. |
Tk. | Kg. |
Tk. | Kg. |
Tk. | Kg. |
Tk. | Kg. |
Tk. | Kg. |
Tk. | |
| |
| |
| |
| |
| |
| |
|
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
ANNEX - 2 (7 OF 12)
FORM NO. 5.
DAILY
HARVESTING INFORMATION (BY MONTHS)
(FISH)
Mullet |
Tilapia | Mystus |
Lates | Eleutheronemus |
Gobius | Others |
Total Fish | Total
Shrimp & fish | |||||||||
Kg. | Tk |
Kg. | Tk |
Kg. | Tk |
Kg. | Tk |
Kg. | Tk |
Kg. | Tk |
Kg. | Tk |
Kg. | Tk |
Kg. | Tk |
|
| |
| |
| |
| |
| |
| |
| |
| |
|
|
| |
| |
| |
| |
| |
| |
| |
| |
|
|
| |
| |
| |
| |
| |
| |
| |
| |
|
|
| |
| |
| |
| |
| |
| |
| |
| |
|
|
| |
| |
| |
| |
| |
| |
| |
| |
|
|
| |
| |
| |
| |
| |
| |
| |
| |
|
|
| |
| |
| |
| |
| |
| |
| |
| |
|
|
| |
| |
| |
| |
| |
| |
| |
| |
|
|
| |
| |
| |
| |
| |
| |
| |
| |
|
|
| |
| |
| |
| |
| |
| |
| |
| |
|
|
| |
| |
| |
| |
| |
| |
| |
| |
|
|
| |
| |
| |
| |
| |
| |
| |
| |
|
|
| |
| |
| |
| |
| |
| |
| |
| |
|
|
| |
| |
| |
| |
| |
| |
| |
| |
|
|
| |
| |
| |
| |
| |
| |
| |
| |
|
|
| |
| |
| |
| |
| |
| |
| |
| |
|
|
| |
| |
| |
| |
| |
| |
| |
| |
|
|
| |
| |
| |
| |
| |
| |
| |
| |
|
|
| |
| |
| |
| |
| |
| |
| |
| |
|
|
| |
| |
| |
| |
| |
| |
| |
| |
|
|
| |
| |
| |
| |
| |
| |
| |
| |
|
|
| |
| |
| |
| |
| |
| |
| |
| |
|
ANNEX - 2 (8 OF 12)
FORM -5.
YEARLY HARVESTING DATA BY MONTHS
(SHRIMP)
Month |
P. monodon | M.
rosenbergii | P. indicus |
M. monoceros | Other
Shrimp | Total Shrimp | ||||||
Kg. |
Tk | Kg. |
Tk | Kg. |
Tk | Kg. |
Tk | Kg. |
Tk | Kg. |
Tk | |
| |
| |
| |
| |
| |
| |
|
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
|
| |
| |
| |
| |
| |
| |
ANNEX - 2 (9 OF 12)
FORM NO. 6.
POND DATA ABSTRACT
Final Harvesting data:
Production data |
Expected |
Actual |
Stocking number | |
|
Survival
rate % | |
|
Av.
Weight (g) | |
|
Culture
duration | |
|
Growth
(g) per week | |
|
Total
P. monodon (kg) | |
|
Total
Shrimp (kg) | |
|
Total
Shrimp & Fish (kg) | |
|
Financial
Data | Expected |
Actual |
Total Sale (Tk) | |
|
Total
Expenditure (Tk.) | |
|
Gross
Profit (Tk.) | |
|
ANNEX - 2 (10 OF 12)
FORM NO. 7.
THANA FISHERY OFFICERS VISIT FORM
Date |
Comments/Advice |
Signature |
| |
|
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
ANNEX - 2 (11 OF 12)
FORM NO. 8
GENERAL VISITS AND SPECIAL DATA
GENERAL VISITS AND SPECIAL DATA | ||
Date |
Visitor | Comments |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
Special information | ||
Date |
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
ANNEX - 2 (12 OF 12)
FORM NO. 9
EXPECTED PROFIT AND EXPENSES OF CULTURE OPERATION
P. monodon culture; Pond size (ha)
(One crop of shrimp of 7 month culture; paddy cultivation/salt production for 5 months).
Expected earning and expenses (only Shrimp farming)
A. Sale proceeds | |
Tk. | ||
| i) Shrimp |
................................... |
................................... | |
| ii) Others |
................................... |
................................... | |
B. Operating costs: | ................................... |
................................... | ||
| (i) Shrimp fry |
................................... |
................................... | |
| (ii) Lease of land |
................................... |
................................... | |
| (iii) Lime |
................................... |
................................... | |
| (iv) Poison |
................................... |
................................... | |
| (v) Fertilisers |
................................... |
................................... | |
| (vi) Feed |
................................... |
................................... | |
| (vii) Pumping cost |
................................... |
................................... | |
| (viii) Screen |
................................... |
................................... | |
| (ix) Screen |
................................... |
................................... | |
| (x) Labour |
................................... |
................................... | |
| |
Whole time | ................................... |
................................... |
| |
Part time | ................................... |
................................... |
| (xi) Maintenance |
................................... |
................................... | |
| (xii) Miscellaneous |
................................... |
................................... | |
C. Profit (A-B): | ................................... |
................................... |
Annex 3
SELECTED NGOs RELATED TO AQUACULTURE
1. BANCHTE
SHEKHA (BS)
Arabpur, Airport Road, Puratan Keshba, Jessore.
Tel. 6436.
Districts:
5; Trained worker M 1, F 0; Beneficiaries: 1,036
Chief: Ms. Angela Comes; Fund:
NORAD, MCC.
2. BANGLADESH RURAL ADVANCEMENT COMMITTEE (BRAC)
66, Mahakhali
C/A., Dhaka-1212, Tel. 884180-7, 600161-4,
FAX: 880-2-883542
District: 22,
Trained Worker: M 15, Beneficiary: M 1,641,
F 2,966, Started: 1976; Chief:
Mr. MFH Abed. Fund: Several.
3. CARITAS, BANGLADESH
2, Outer Circular Road,
Shantibagh, Dhaka-1217.
Tel. 835641, 835405-9, FAX: 880-2-834993
District:
18, Trained Worker: M 38, F 1,
Chief: J. S. Pereira; Fund: Caritas International.
4.
GANDHI ASHRAM
Vill: Joyag, Thana Begumganj, Dist. Noakhali
Tel 0321-3014-10
District:
1, Trained worker: M1, F 1, Started: 1987
Chief: Ms. Jharna Dhara Chowdhury;
Fund: UNDP, ICLARM.
5. GONO UNNAYAN PROCHESTA (GUP)
13C/10C Babar Road, Block-B,
Mohammadpur, Dhaka-1203
Tel. 813216, 324925.
District: 3, Trained worker:
M 2, F 0, Started: 1973.
Chief: Mr. M. Ataur Rahman; Fund: WFP, MCC, ODA, Christian
Aid.
6. GANOSHAHAJJO SANGSTHA (GSS)
Address: 41, Sir Syed Ahmed Road, Block-A,
Mohammadpur, Dhaka-1207
Tel. 323465, 814986-7.
District covered: 8, Trained
Worker: M 59, F 4,
Executive head: Dr. Mahmood Hassan, Fund SIDA, EU, NORAD.
7.
HEED BANGLADESH
Address: House 19, Main Road, Block A, Section II, Mirpur,
Dhaka
Tel. 803558, 802423.
District: 1; Trained worker: M 20, Executive
head: Ms. Maya Hilton; Fund: APHED,
USCCB-Canada.
8. JAGORANI CHAKRA (JC)
Address:
44 Mujib Sarak, Jessore 7400.
Tel. 0421-6218
District: 3; Trained worker:
M 13, F 2, fund: CAQE
SAP- Bangladesh, ICLARM, WFP, UNDP,
Executive head:
Mr. A K Arzoo
9. MENONITE CENTRAL COMMITTE
Address: 1/1, Block-A, Asadgate,
Mohammadpur, Dhaka-1207
Tel 9116461, 9117065
District: 3; Trained worker:
M 53; F 25. Executive head: Mr. Gordon Zook;
Beneficiaries = M 2,683, F 1630
Fund:
MCC. Akron, DANIDA, OXFAM.
10. PROSHIKA MANOBIK UNNAYAN KENDRA (P-MUK)
1/1-GA,
Section 2, Mirpur-2, Dhaka-1216
Tel. 803398, 805812
Trained worker: M 63,
F 6, Beneficiaries: M 34,535, F 14790; District: 24.
Chief: Mr. Quazi Farooque
Ahmed; Fund: CIDA, SIDA, ODA, Ford Foundation, ECI
11. RANGPUR - DINAJPUR RURAL
SERVICES (RDRS)
House No. 32, Road No. 7A, Dhanmondi, Dhaka-1000,
Tel. 816184-5,
9110101-3.
District: 4; Trained Worker: M 8, F 0, Beneficiaries T0,560
Chief:
Dr. Allen Armstrong; Fund: Lutheran Church Mission.
12. THENGAMARA MOHILA SABUJ
SANGHA (TMSS)
Vill: Thengamara, P.O. Gokul, Bogra
District: Bogra; Trained
worker: M 2, F 2, Beneficiaries: F 225, M 0
Chief: Prof. Hosneara Begum.
13.
UTTARAN
Vill: Jatpur, P.O. Tala, Dist. Satkhira,
District: 1; Trained worker:
M 112, F 21, Beneficiaries M 448.
Chief: Mr. Shahidul Islam; Fund: OXFAM, MCC.
Annex 4
Brief description of pond fish culture technologies under three development projects
Selected measures | Projects |
| | |
| Extension Project, Mymensingh
(DANIDA) | Institutional Strengthening
Project (FAO/DANIDA) | 2nd Aquaculture
Development Project (ADB) | |
1. Complete pond drying | At
least, every few year | At least,
every 3rd year | Every year | |
2. Poisoning |
Yes, if pond not dried | Yes,
in years pond not dried | Never | |
3. Liming before stocking
(kg/ha) | 250 Ca(OH)2 |
250 Ca (OH)2 | 600
crushed CaO | |
4. Water supply | Rainwater |
Rain water | Rainwater | |
5. Fertilisation pre-stocking |
1250 kg if pond is dry, | 600 |
No | |
|
- Cowdung (kg/ha) | 450 kg if
pond has water | |
|
-
TSP: Urea MP (kg/ha) | 22:15:0
Dissolved with cowdung | 15:30:5 | 38:19:0/ha one
time repeat dose if after 10 days water is not green enough and SDR is above 25
cm. | |
6.
Fertilization post-stocking: | 50
kg/ha/day |
45 kg/ha/day |
40 kg/ha/day until SDR goes below 25 cm | |
| - Cowdung (kg/ha) |
| |
|
-
TSP: Urea: MP (kg/ha) | 22:15:0
SDR goes above 30 cm | 0.5:1.0
daily | 38:19:0/ha one time if
SDR goes above 25 cm | |
7. Stocking density ha. | Max
10,000 | Max 6,250 |
Max 10,000 | |
| - With fertilisation
and feeding | C 750, SC 3000 | C
1000, SC 1250 |
C 1225, SC 3300 |
- Fertilization only
no feeding | RP 3000 |
RP 500 | Not done. | |
8. Feeding |
At 4 percent of fish body weight only recebrom no lilcake, leaves for GC. |
At 2 percent of fish body weight RB: |
First 45 days 5 percent | |
9. Periodic harvesting | Yes |
Yes | Yes | |
10. Production (Kg/ha/yr) |
4000 | 4100 |
4300 (1994) |
NOTE: C = Catla, CC = Common Carp, GC = Grass Carp, M = Mrigal, MC = Mirror Carps, SC = Silver Carp, R = Rui, RB = Rice bran, MOC = Master Oil Cake, SDR = Secchi disc reading.