APPENDIX 1 ASSESSMENT OF FOOD SAFETY PROGRAMMES (Hans Henrik Huss)


The assessment process covers the following 7 steps:

1.

Pre-assessment document review


- process flow diagram with location of CCPs
- product specifications
- HACCP plan including worksheets and records
- Prerequisite plans including worksheet and records

2.

Opening meeting


- scope
- process
- schedule
- amenities needed

3.

On-site verification of process flow diagram

4.

On-site document review and observations


- product and ingredients specifications
- previous audit reports and minutes of HACCP meetings
- assessment of prerequisite programmes and functions (form attached)
- assessment of HACCP programmes and functions (form attached)

5.

Closing meeting

6.

Assessment report

7.

Assessment follow-up

The following five pages give examples of forms that can be used for on-site evaluation of the HACCP and prerequisite programmes.

ON-SITE DOCUMENT REVIEW AND OBSERVATIONS

Assessment of HACCP Programme

Name and address of establishment audited

Phone/fax/email

Facility Owner (company or person)

Date of audit

Products Concerned

Products - High or low risk

Name and Number of Inspector

Name and Title of Accompanying Individual


HACCP






A

B

C

Note

HACCP team used was appropriate





Raw materials specifications defined and written down





Product and ingredient specifications are defined and written down





Product end use is defined and recorded (high or low risk product)





Flow diagram is written down and is accurate and complete





Hazard analysis is written down and is accurate and complete (evidence of Hazard Worksheets)





Identification of CCPs is documented and CCPs are appropriate for product and end use of product





Critical limits have been established, documented and are appropriate for the CCP





Monitoring procedures for each CCP are documented, are followed and records are kept





Corrective actions identified, written down and are followed when critical limits exceeded. Records exist





Verification procedures are documented and are followed. Records exist





All necessary documentation exists and are available for inspection





A = excellent, good or only minor deficiencies (no safety risk)

B = major or serious deficiencies, which could lead to a safety risk if not controlled. Any condition or situation rated as a B requires a plan or programme for rapid improvement. Repetitive or cumulative B-ratings can lead to a critical situation.

C = an unacceptable or critical situation representing a safety risk. Any C-rating requires immediate response and corrective action.

Assessment of Pre Requisite Programmes

FACTORY CHECK





Processing Plant

A

B

C

Note

Outside





Condition of grounds outside the factory





Condition of the factory outside wall - especially holes through to inside





Inside





Rooms

- layout and flow of goods and people allows easy cleaning and prevents cross contamination





Rooms

- for clean and unclean areas are separated (including waste areas)





Rooms

- for non food items are separated e.g. packaging, chemicals, etc.





Ceilings, walls, floors, doors and windows are well designed and maintained in good repair -






- for areas directly affecting food product or primary packaging material






- for other areas





Drains

- are well designed, sufficient and maintained in good repair





Drains

- there is protection against back-flow, back-siphoning, or other sources of contamination





Lighting

- is sufficient and lights are covered





Pest control

- exclusion devices (screens, mesh, etc.) are present at all openings to outside and maintained in good repair





Pest control

- No areas present to harbour or attract pests





Ventilation

- is sufficient, well designed and there is no condensation evident





Facilities in Processing Plant

A

B

C

Note

Water

- sufficient quantity of cold water available, clear marking and separation of potable and non-potable water





Water

- sufficient quantity of hot water/steam available





Ice

- sufficient quantity available and storage facility well designed and kept in good order and repair





Chilling and freezing facilities - sufficient capacity





Waste-water

- leaves the property in a condition that meets environmental laws





Hygiene

- changing rooms are sensibly located, are well designed and are kept in good repair





Hygiene

- toilets are sensibly located and in sufficient numbers and kept in good repair





Hygiene

- Hand-washing and sanitizing stations are in sufficient numbers, well designed, well located and kept in good repair





Equipment

- containers made of appropriate materials, in proper repair and removed when necessary





Equipment

- machinery designed well, easy to clean and kept in good repair - Food contact surfaces





Equipment

- machinery designed well, easy to clean and kept in good repair - Non-food contact surfaces






PROCEDURES





Safety of water and ice

A

B

C

Note

Criteria are written down and are appropriate





Monitoring procedure is written down, is followed and records are kept





Corrective actions identified, written down and are followed when critical limits exceeded. Records exist.





Cleaning and disinfection

A

B

C

Note

Cleaning and disinfection methods (food contact and non-contact surfaces) are written down and are appropriate





Monitoring procedure for cleanliness is written down, is followed and records are kept





Corrective actions identified, written down and are followed when critical limits exceeded. Records exist.





Personal observations in factory by auditor





Personnel hygiene and health

A

B

C

Note

Personnel hygiene criteria (cleanliness, dress code) are written down and are appropriate





Procedures to handle illness are written down and are appropriate





Monitoring procedure for personnel hygiene and health is written down, is followed and records are kept





Corrective actions identified, written down and are followed when critical limits exceeded. Records exist.





Personal observations of personnel by auditor





Prevention of cross contamination

A

B

C

Note

Criteria to prevent cross contamination are written down and are appropriate





Monitoring procedure is written down, is followed and records are kept





Corrective actions identified, written down and are followed when critical limits exceeded. Records exist.





Personal observations in factory by auditor





Maintenance of facilities for personal hygiene





Methods to maintain personal hygiene facilities are written down and are appropriate





Monitoring procedure is written down, is followed and records are kept





Corrective actions identified, written down and are followed when critical limits exceeded. Records exist.





Personal observations in factory by auditor





Protection of food from adulterants

A

B

C

Note

Criteria to protect food from adulteration are written down and are appropriate





Monitoring procedure is written down, is followed and records are kept





Corrective actions identified, written down and are followed when critical limits exceeded. Records exist.





Personal observations in factory by auditor





Waste management

A

B

C

Note

Methods to handle sewage and processing waste are written down and are appropriate





Monitoring procedure is written down, is followed and records are kept





Corrective actions identified, written down and are followed when critical limits exceeded. Records exist.





Personal observations in factory by auditor





Recalls and traceability

A

B

C

Note

Methods to allow full traceability and recall of product are written down and are appropriate





Monitoring procedure is written down, is followed and records are kept





Corrective actions identified, written down and are followed when critical limits exceeded. Records exist.





Personal observations in factory by auditor





Training

A

B

C

Note

Training policy and programme are written down, are appropriate and followed





Monitoring procedure is written down, is followed and records are kept





Corrective actions identified, written down and are followed when critical limits exceeded. Records exist.





Personal observations of training in factory by auditor, if possible





Pest Control

A

B

C

Note

Pest control procedures are written down and are appropriate





Monitoring procedure is written down, is followed and records are kept





Corrective actions identified, written down and are followed when critical limits exceeded. Records exist.





Personal observations in factory by auditor





Labeling and safe storage and use of toxic chemicals

A

B

C

Note

Toxic chemical handling, use and storage procedures are written down and are appropriate





Monitoring procedure is written down, is followed and records are kept





Corrective actions identified, written down and are followed when critical limits exceeded. Records exist.





Personal observations in factory by auditor





Transport and storage

A

B

C

Note

Temperature and cleanliness criteria for transport and storage are written down and are appropriate





Monitoring procedure is written down, is followed and records are kept





Corrective actions identified, written down and are followed when critical limits exceeded. Records exist.





Personal observations in factory by auditor






NOTES

Note number from form

Comment
















SUMMARY





Totals numbers of each category





General comments from auditor

General comments from establishment representative


SIGNATURES

Signature of auditor

Date

Signature of establishment representative

Date


Previous Page Top of Page Next Page