Previous Page Table of Contents Next Page


ANNEX III.3 Data sheet 3: Determination of net scheme irrigation need for rice

Planting period:
Growing period:
Crop factors: Kc

Day 0-60
Mid season
Last 30 days

SAT:

mm Early

Late

PERC:

mm/day = mm/month

WL

mm Early

Late

Month

Jan

Feb

Mar

Apr

May

June

July

Aug

Sept

Oct

Nov

Dec

area













cropping pattern













ha













ET0 (mm/day)













Pe (mm/mon)













Growth stages













Kc per gr. st.













Kc per month1













ETcr mm/mon2













SAT mm/mon













PERC mm/mon













WL mm/mon













INe mm/mon3













Growth stages













Kc per gr. st.













Kc per month1













ETcr mm/mon2













SAT mm/mon













PERC mm/mon













WL mm/mon













IN1 mm/mon3













INav mm/mon













SINnet l/s4













1 average of Kc per month
2 ETcr (mm/mon) = ET0 (mm/day) x crop growing days per month x Kc (per month)
3 INe (mm/mon) = ETcr (mm/mon) - Pe (mm/mon)
4 SINnet = (INav x Area) / 260

Note: When cultivation does not start on the first of a month or when cultivation periods do not coincide with full months, the water requirement should be divided over the two months according to the number of days that fall in each month.


Previous Page Top of Page Next Page