FI:DP/TUR/87/029
Field Document 3
April 1989
TURKEY
MARINE AQUACULTURE AND LAGOON FISHERIES DEVELOPMENT
TABLE OF CONTENTS

A report prepared for the project Establishment of Beymelek Lagoon Aquaculture Centre


by


L. Berg and R. Vétillart
Consultants


This report was prepared during the course of the project identified on the title page. The conclusions and recommendations given in the report are those considered appropriate at the time of its preparation. They may be modified in the light of further knowledge gained at subsequent stages of the project.

The designations employed and the presentation of the material in this document do not imply the expression of any opinion whatsoever on the part of the United Nations or the Food and Agriculture Organization of the United Nations concerning the legal or constitutional status of any country, territory or sea area, or concerning the delimitation of frontiers.

SUMMARY

Main detailed drawings and specifications were provided during the mission for the establishment of the Beymelek Lagoon Aquaculture Centre. Turkish engineers are completing detailed construction drawings, calculations, specifications, bills of quantities and costings.

A detailed and up-to-date work plan was prepared which allows for beginning of construction in April/May.

The programmes and budget were revised for the Project Personnel as part of the U.N.D.P. contribution. Following the recommendations made during last mission (18 M/M for consultants, 18 M/M for a hatchery specialist and 24–30 M/M for the Senior Advisor), a budget extension was accepted by U.N.D.P. to cover 15 M/M, 6 M/M and 18 M/M, respectively. Should the project proceed and develop according to the plan and expected inputs, the U.N.D.P. contribution towards the Project Personnel should be extended at least to 1990 and 1991.

Final equipment lists and estimated budget were prepared. The equipment covered by U.N.D.P. contribution includes hatchery and laboratory equipment. The contribution (112.000 USD) is not sufficient to cover the equipment to be imported for the project. Through a cost sharing agreement, additional equipment (hatchery special equipment, main pumps and a generator) will be covered by G.O.T. contribution and be imported by U.N.D.P. (approximately 500.000 USD in 1989). The same agreement should be established for further equipment to be imported in 1990 and 1991. The Senior Advisor and National project Coordinator will prepare up-to-date lists for equipment to be purchased locally in 1989 and for the whole equipment required for project implementation in 1990 and 1991.

Outlines of the training courses, fellowships and study tours have already been discussed with the National Project Coordinator. Definite programmes will be established by Senior Advisor and Project Coordinator.

FOOD AND AGRICULTURE ORGANIZATION OF THE UNITED NATIONS
Rome, 1989


Hyperlinks to non-FAO Internet sites do not imply any official endorsement of or responsibility for the opinions, ideas, data or products presented at these locations, or guarantee the validity of the information provided. The sole purpose of links to non-FAO sites is to indicate further information available on related topics.

This electronic document has been scanned using optical character recognition (OCR) software. FAO declines all responsibility for any discrepancies that may exist between the present document and its original printed version.


TABLE OF CONTENTS

1. INTRODUCTION

1.1 Terms of reference and programme of mission
1.2 Main achievements of the mission
1.3 Short description of project implementation stage

2. DETAILED DESIGN

2.1 Description of the farm
2.2 Further technical specifications and recommendations

3. WORK PLAN FOR PROJECT IMPLEMENTATION

4. PROJECT PERSONNEL

4.1 Turkish personnel
4.2 U.N.D.P./F.A.O. personnel

5. EQUIPMENT

5.1 Equipment purchased before October 1988
5.2 Equipment to be included in the U.N.D.P. contribution
5.3 Equipment to be purchased and imported by G.O.T.
5.4 Other equipment to be purchased locally by G.O.T. in 1989
5.5 Equipment to be purchased after 1989

6. TRAINING/FELLOWSHIP PROGRAMMES

7. SUMMARY OF MAIN RECOMMENDATIONS

LIST OF APPENDICES

APPENDIX 1: TERMS OF REFERENCE AND PROGRAMME

A 1.1 Terms of reference
A 1.2 Programme of the mission

APPENDIX 2: DETAILED DESIGN

A 2.1 List of drawinge prepared
A 2.2 Water requirements for the farm
A 2.3 Bio-technical data of hatchery production
A 2.4 Bio-technical data of single hatchery crop
A 2.5 Hatchery flow-chart
A 2.6 Monk specifications
A 2.7 Main technical recommendations
A 2.8 Additional detailed drawings
A 2.9 Particular technical clauses

APPENDIX 3: WORK PLAN

A 3.1 Detailed work plan
A 3.2 Terms of reference for February mission

APPENDIX 4: PROJECT PERSONNEL

A 4.1 List of personnel involved during the mission
A 4.2 List of personnel to be assigned
A 4.3 Project personnel (UNDP contribution)
A 4.4 Bar chart: consultants and expert
A 4.5 Terms of reference for Senior Advisor
A 4.6 A.P.O.S : qualifications and programme

APPENDIX 5: EQUIPMENT LISTS

A 5.1 Equipment already purchased by G.O.T. (1988)
A 5.2 Equipment to be imported in 1989
A 5.3 Further equipment to be purchased locally (1989)
A 5.4 Specifications for UNDP contribution equipment
A 5.5 Quotation forms for pumps and generators