Permanent Carpenters
Uburaj Giri
Tek Bahadur Gurung
Trainees
Kali Bahadur Bhujal
Hari Bahadur Chhetri
Man Bahadur Gurung
Dhun Bahadur Pode
Nara Bahadur Chhetri
Bala Bahadur Thapa
Previous Trainees
Ram Bahadur Chhetri
Hamaraj Giri
Pashapati Sharma
3.20m Planked canoe | ||||
GENERAL ARRANGEMENT | ||||
Scale: 1:10, 1:1 | Project No. | Drwg. No. | ||
Design CDN | Drawn AB | NEP-73 | 1 | |
Pokhara, May 1977 |
4.20m Tourist Boat | ||||
GENERAL ARRANGEMENT | ||||
Scale: 1:10, 1:2, 1:1 | Project No. | Drwg. No. | ||
Design CDN | Drawn AB | NEP-73 | 2 | |
Pokhara, April 1977 |
5.50m Fishing Boat | ||||
GENERAL ARRANGEMENT | ||||
Scale: 1:10, 1:1 | Project No. | Drwg. No. | ||
Design CDN | Drawn AB | NEP-73 | 3 | |
Pokhara, April 1977 |
7.30m Transport boat | ||||
GENERAL ARRANGEMENT | ||||
Scale: 1:10, 1:2 | Project No. | Drwg. No. | ||
Design CDN | Drawn AB | NEP-73 | 4 | |
Pokhara, July 1977 |
Equipment at Boatyard | ||||
WORK BENCH | ||||
Scale: 1:10 | Project No. | Drwg. No. | ||
Design CDN | Drawn AB | NEP-73 | 5 | |
Pokhara, August 1977 |
Equipment at Boatyard | ||||
ROLLER HORSE FOR BANDSAW | ||||
Scale 1:10 - 1:5 | Project No. | Drwg. No. | ||
Design CDN | Drawn AB | NEP-73 | 6 | |
Pokhara, August 77 |
Lake safety | ||||
LIFE JACKET | ||||
Scale 1: 5 | Project No. | Drwg. No. | ||
Design CDN | Drawn AB | NEP-73 | 7 | |
Pokhara, August 77 |
Illustration 1: ONE-MAN FISHING BOAT. POKHARA, NEPAL, 1977.
Illustration 2: TRYING OUT 7.3 m TRANSPORT BOAT. POKHARA, NEPAL, 1977.
Illustration 3: 5.5 m FISHING BOAT IN USE. POKHARA, NEPAL 1977.