2 PROJECT SUMMARIES

(06) The remaining pages of the present report present the Project Summaries in programme code order. For quick consultation a complete list of the Summaries has been presented in the list of contents (p. 1, 2 and 3).

PROJECT TITLE:Integrated duck-fish-crop farming systemsCODE: A-01
   
STATION OF EXECUTION:FARS, Mymensingh 
   
PROGRAMME:Integrated aquaculture 
   
RESEARCH AREA(S): CODE(S):    
- Pond production management04-08

OBJECTIVES:

  1. determination of optimum density of ducks, for maximizing fish production in an integrated system, under prevailing local socio-economic conditions;
  2. determination of stocking densities and species composition of fish required for optimizing production in the integrated system;
  3. development of production programmes for economic utilization of pond embankments for growing vegetables and crops for human and/or livestock consumption.
TIME SCHEDULE:
- DATE OF COMMENCEMENT:20.09.1986   
- DATE OF COMPLETION:19.09.1989   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 111
- NO OF SUPPORTING STAFF: 333
   
ESTIMATED BUDGET (in Taka):   
- OPERATIONAL EXPENSES:800,000   
- CAPITAL EXPENSES:100,000   
 
- TOTAL:900,000   
PROJECT TITLE:Integrated chicken-fish-crop farming systemsCODE: A-02
   
STATION OF EXECUTION:FARS, Mymensingh 
   
PROGRAMME:Integrated aquaculture 
   
RESEARCH AREA(S): CODE(S):    
- Pond production management04-09

OBJECTIVES:

  1. determination of optimum density of chicken for maximizing fish production in an integrated system under prevailing local conditions;
  2. determination of stocking densities and species composition of fish required for optimizing production in the integrated system;
  3. development of production programmes for economic utilization of pond embankments for growing vegetables/crops for human and/or livestock consumption.
TIME SCHEDULE:
- DATE OF COMMENCEMENT:01.02.1987   
- DATE OF COMPLETION:31.01.1990   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 111
- NO OF SUPPORTING STAFF: 333
   
ESTIMATED BUDGET (in Taka):   
- OPERATIONAL EXPENSES:800,000   
- CAPITAL EXPENSES:100,000   
 
- TOTAL:900,000   
PROJECT TITLE:On farming testing and demonstration of integrated livestock-fish-crop farming systemsCODE: A-03
   
STATION OF EXECUTION:FARS, Mymensingh 
   
PROGRAMME:Integrated aquaculture 
   
RESEARCH AREA(S): CODE(S):    
- Pond production management04-08/04-09
- Socio-economics 14-04

OBJECTIVES:

  1. testing under field conditions the results obtained at FARS in integrated livestock-fish-crop farming systems research (projects A-01 and A-02) ;
  2. demonstration of integrated farming techniques;
  3. preparation of extension pamphlets.
TIME SCHEDULE:
- DATE OF COMMENCEMENT:01.09.1988   
- DATE OF COMPLETION:30.08.1989   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 1--
- NO OF SUPPORTING STAFF:2--
   
ESTIMATED BUDGET (in Taka):   
- OPERATIONAL EXPENSES:200,000   
- CAPITAL EXPENSES:          -   
 
- TOTAL:200,000   
PROJECT TITLE:Early maturation of carps by environmental manipulationCODE: B-01
   
STATION OF EXECUTION:FARS, Mymensingh 
 
PROGRAMME:Fish reproduction and hatchery management
   
RESEARCH AREA(S):  
- Reproduction of freshwater species09-01/09-07

OBJECTIVES:

  1. provision of fish farmers with spawn of cultivated carps over a longer period of the year than it is at present, by inducing early maturation in carps through manipulation of the (micro-)environment of the broodstock;
  2. optimize the utilization of hatchery and nursing space.
TIME SCHEDULE:
- DATE OF COMMENCEMENT:01.01.1988   
- DATE OF COMPLETION:30.04.1989   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 11-
- NO OF SUPPORTING STAFF: 22-
   
ESTIMATED BUDGET (in Taka):   
- OPERATIONAL EXPENSES:200,000   
- CAPITAL EXPENSES:          -   
 
- TOTAL:200,000   
PROJECT TITLE:Effects of different stocking densities, feeding and fertilization on maturation of carpsCODE: B-02  
 
STATION OF EXECUTION:FARS, Mymensingh 
 
PROGRAMME:Fish reproduction and hatchery management
   
RESEARCH AREA(S): CODE(S):    
- Reproduction of freshwater species09-01
- Pond production management04-01
- Nutrition and feed10-05

OBJECTIVES:

  1. determination of the optimum stocking density in brood fish ponds for obtaining maximum spawning success with different species combinations;
  2. determination of the quality and quantity of feed needed for optimum maturation of carps.
TIME SCHEDULE:
- DATE OF COMMENCEMENT:01.01.1987   
- DATE OF COMPLETION:31.12.1989   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 111
- NO OF SUPPORTING STAFF: 222
 
ESTIMATED BUDGET (in Taka):
- OPERATIONAL EXPENSES:250,000   
- CAPITAL EXPENSES:100,000   
 
- TOTAL:350,000   
PROJECT TITLE:Multiple spawning of carpsCODE: B-03  
   
STATION OF EXECUTION:FARS, Mymensingh 
 
PROGRAMME:Fish reproduction and hatchery management
   
RESEARCH AREA(S): CODE(S):    
- Reproduction of freshwater species09-01
- Pond production management04-01
- Nutrition and feed 10-05

OBJECTIVES:

  1. development of rearing methodologies for second spawning (in the same year) of carps through manipulation of stocking densities, feeding rates and fertilization schedules.
TIME SCHEDULE:
- DATE OF COMMENCEMENT:01.04.1987   
- DATE OF COMPLETION:31.03.1990   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 111
- NO OF SUPPORTING STAFF: 222
    
ESTIMATED BUDGET (in Taka):
- OPERATIONAL EXPENSES:250,000   
- CAPITAL EXPENSES:  50,000   
 
- TOTAL:300,000   
PROJECT TITLE:Identification of criteria for maturity stage determination and hormone requirements of carps CODE: B-04
   
STATION OF EXECUTION:FARS, Mymensingh 
 
PROGRAMME:Fish reproduction and hatchery management
   
RESEARCH AREA(S): CODE(S):  
- Reproduction of freshwater species09-01/09-07

OBJECTIVES:

  1. development of criteria for identification of ready-to-spawn female brood carps;
  2. determination of hormone doses required for succesful breeding of fish at different maturity stages.
TIME SCHEDULE:
- DATE OF COMMENCEMENT:01.04.1987   
- DATE OF COMPLETION:31.09.1988   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 11-
- NO OF SUPPORTING STAFF: 11-
    
ESTIMATED BUDGET (in Taka):   
- OPERATIONAL EXPENSES:240,000   
- CAPITAL EXPENSES:  60,000   
 
- TOTAL:300,000   
PROJECT TITLE:Efficacy of marine fish pituitary for breeding carpsCODE: B-05
   
STATION OF EXECUTION:FARS, Mymensingh 
 
PROGRAMME:Fish reproduction and hatchery management
   
RESEARCH AREA(S): CODE(S): 
- Reproduction of freshwater species09-01/09-07

OBJECTIVES:

  1. evaluation of the efficacy of (easily available) marine pituitary for breeding Indian and Chinese carps;
  2. determination of the dose of marine fish pituitary neded for breeding Indian and Chinese carps.
TIME SCHEDULE:
- DATE OF COMMENCEMENT:01.04.1988   
- DATE OF COMPLETION:31.09.1989   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 11-
- NO OF SUPPORTING STAFF: 11-
 
ESTIMATED BUDGET (in Taka):
- OPERATIONAL EXPENSES:200,000   
- CAPITAL EXPENSES:100,000   
 
- TOTAL:300,000   
PROJECT TITLE:Systems/techniques for pond and rice field breeding of Clarias sp.CODE: B-06
   
STATION OF EXECUTION:FARS, Mymensingh 
 
PROGRAMME:Fish reproduction and hatchery management
   
RESEARCH AREA(S): CODE(S):    
- Reproduction of freshwater species09-03
- Pond production management04-01/04-02/04-05/04-11
- Socio-economics 14-04

OBJECTIVES:

  1. development of methods/techniques for breeding of Clarias sp. in ponds and rice fields, in order to achieve large scale production of fingerlings;
  2. development of techniques for nursing of fry/fingerlings in ponds and rice fields;
  3. training of farmers in the techniques developed in this project.
TIME SCHEDULE:
- DATE OF COMMENCEMENT:01.04.1987   
- DATE OF COMPLETION:31.09.1990   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 111
- NO OF SUPPORTING STAFF: 333
 
ESTIMATED BUDGET (in Taka):
- OPERATIONAL EXPENSES:400,000   
- CAPITAL EXPENSES:100,000   
 
- TOTAL:500,000   
PROJECT TITLE:Genetical improvement of cultivated carps and catfishCODE: B-07
   
STATION OF EXECUTION:FARS, Mymensingh 
 
PROGRAMME:Fish reproduction and hatchery management
   
RESEARCH AREA(S): CODE(S):    
- Reproduction of freshwater species09-02

OBJECTIVES:

  1. assay of available genetic variations in cultured carps and catfish by enzyme electrophoresis;
  2. production of gynogenetics (for fast inbreeding) by heat/cold shock treatment of eggs fertilized with UV-irradiated sperms;
  3. production of hybrid vigor between gynogenetically produced intergeneric and interspecific hybrids;
  4. production of triploids and tetraploids;
  5. karyologicical and biochemical genetic cntrol of manipulated individuals;
  6. comparison of growth performance between normal, diploid, triploid and tetraploid individuals produced;
  7. development of special techniques (sex-reversal, cryopreservation of sperm).
TIME SCHEDULE:
- DATE OF COMMENCEMENT:01.03.1987   
- DATE OF COMPLETION:28.02.1990   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 111
- NO OF SUPPORTING STAFF: 333
    
ESTIMATED BUDGET (in Taka):   
- OPERATIONAL EXPENSES:550,000   
- CAPITAL EXPENSES:450,000   
 
- TOTAL:1,000,000   
PROJECT TITLE:Development of nursery pond management methodsCODE: C-01
   
STATION OF EXECUTION:FARS, Mymensingh 
 
PROGRAMME:Pond production systems development
   
RESEARCH AREA(S): CODE(S):    
- Pond production management04-02/04-01/04-07
- Nutrition and feed 10-04/10-05
- Socio-economics 14-05

OBJECTIVES:

  1. development of methodologies for single and two stage nursing of fry/fingerlings;
  2. determination of optimum stocking densities of fry/fingerlings;
  3. determination of quality and quantity of fertilizers/manures required for optimum growth and survival of fry/fingerlings;
  4. determination of quality and quantity of feed needed at different stocking densities;
  5. improvement of survival of fry/fingerlings during transportation;
  6. determination of the economics of different operations;
  7. demonstration of practices developed and preparation of extension pamphlets.
TIME SCHEDULE:
- DATE OF COMMENCEMENT:01.02.1987   
- DATE OF COMPLETION:31.01.1990   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 111
- NO OF SUPPORTING STAFF: 222
   
ESTIMATED BUDGET (in Taka):
- OPERATIONAL EXPENSES:654,000   
- CAPITAL EXPENSES:  96,000   
 
- TOTAL:750,000   
PROJECT TITLE:Polyculture of cultivated species for optimizing production from pondsCODE: C-02
   
STATION OF EXECUTION:FARS, Mymensingh 
   
PROGRAMME:Pond production systems development 
   
RESEARCH AREA(S): CODE(S): 
- Pond production management04-01/04-07

OBJECTIVES:

  1. determination of optimum stocking densities and species ratios of different cultivated species for maximizing growth and yield;
  2. determination of optimum fertilization and feeding rates for different stocking densities and species compositions;
  3. determination of methodologies for control of predators and competitors;
  4. demonstration of the results to the farmers and preparation of extension pamphlets.
TIME SCHEDULE:
- DATE OF COMMENCEMENT:01.03.1987   
- DATE OF COMPLETION:28.02.1990   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 111
- NO OF SUPPORTING STAFF: 222
    
ESTIMATED BUDGET (in Taka):   
- OPERATIONAL EXPENSES:480,000   
- CAPITAL EXPENSES:110,000   
 
- TOTAL:590,000   
PROJECT TITLE:Pond production systems for mono and mixed culture of Clarias sp.CODE: C-03
   
STATION OF EXECUTION:FARS, Mymensingh 
   
PROGRAMME:Pond production systems development 
   
RESEARCH AREA(S): CODE(S):     
- Pond production management04-05

OBJECTIVES:

  1. determination of optimum stocking densities in mono- and poly-culture (with carps) based on Clarias sp.;
  2. determination of optimum fertilization and feeding rates;
  3. determination of the economics of different operations;
  4. demonstration of results to small-scale farmers.
TIME SCHEDULE:
- DATE OF COMMENCEMENT:01.03.1987   
- DATE OF COMPLETION:28.02.1990   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 111
- NO OF SUPPORTING STAFF: 222
     
ESTIMATED BUDGET (in Taka):    
- OPERATIONAL EXPENSES:410,000   
- CAPITAL EXPENSES:  90,000   
 
- TOTAL:500,000   
PROJECT TITLE:Survey of Clarias populations in the country for identification and selection of suitable stocksCODE: C-04
   
STATION OF EXECUTION:FARS, Mymensingh 
   
PROGRAMME:Pond production systems development 
   
RESEARCH AREA(S): CODE(S):      
- Pond production management04-05
- Reproduction freshwater species09-02/09-03

OBJECTIVES:

  1. survey of Clarias populations in the country to identify morphological, meristic, and genetic differences, if any, between these populations;
  2. selection of suitable stocks for pond production.
TIME SCHEDULE:
- DATE OF COMMENCEMENT:01.04.1988   
- DATE OF COMPLETION:31.03.1990   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 11-
- NO OF SUPPORTING STAFF: 22-
 
ESTIMATED BUDGET (in Taka):
- OPERATIONAL EXPENSES:500,000   
- CAPITAL EXPENSES:          -   
 
- TOTAL:500,000   
PROJECT TITLE:Techniques for culture and breeding of small indigenous and introduced species in BangladeshCODE: C-05
   
STATION OF EXECUTION:FARS, Mymensingh 
   
PROGRAMME:Pond production systems development 
   
RESEARCH AREA(S): CODE(S):  
- Pond productin management04-04/04-06
- Reproduction freshwater species09-04/09-06
- Socio-economics 14-01/14-04/14-05

OBJECTIVES:

  1. introduction and popularizatrion of tilapia and small fish farming as homestead enterprise of rural people;
  2. development and adaptation of viable small-scale aquaculture technologies of these fishes;
  3. investigations into the profitability and economic viability of tilapia and small fish farming operations;
  4. feed back of results obtained in the experimental field to the marginal farmers through extension and demonstration services.
TIME SCHEDULE:
- DATE OF COMMENCEMENT:01.01.1987   
- DATE OF COMPLETION:31.12.1989   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 333
- NO OF SUPPORTING STAFF: 555
 
ESTIMATED BUDGET (in Taka):
- OPERATIONAL EXPENSES:1,330,000   
- CAPITAL EXPENSES:   170,000   
 
- TOTAL:1,500,000   
PROJECT TITLE:Technologies for the culture of the edible frog Rana tigrinaCODE: C-06
   
STATION OF EXECUTION:FARS, Mymensingh 
   
PROGRAMME:Pond production systems development 
   
RESEARCH AREA(S): CODE(S):    
- Pond production management04-06
- Socio-economics 14-01/14-05

OBJECTIVES:

  1. development of culture systems to increase the sustainable yield of exportable froglegs, especially of the bull frog Rana tigrina;
  2. determination of the economics of frog culture in Bangladesh.
TIME SCHEDULE:
- DATE OF COMMENCEMENT:01.07.1987   
- DATE OF COMPLETION:30.06.1995   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 111216
- NO OF SUPPORTING STAFF: 131316
   
ESTIMATED BUDGET (in Taka):
- OPERATIONAL EXPENSES:5,360,000   
- CAPITAL EXPENSES:5,440,000   
 
- TOTAL:10,800,000   
PROJECT TITLE:Survey of potential fish feed ingredients of Bangladesh on the basis of their availability and biochemical compositionCODE: D-01
 
STATION OF EXECUTION:FARS, Mymensingh 
   
PROGRAMME:Fish feed and nutrition 
   
RESEARCH AREA(S):    CODE(S):
- Nutrition and feed 10-01/10-02

OBJECTIVES:

  1. identification of where, when, in what form potential feed ingredients, that are economically, technically and nutritionally feasible to include in fish feeds, are available in the country;
  2. determination of the biochemical composition of each of the enlisted ingredients/raw materials.
TIME SCHEDULE:
- DATE OF COMMENCEMENT:01.01.1987   
- DATE OF COMPLETION:31.12.1987   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 2--
- NO OF SUPPORTING STAFF: ---
   
ESTIMATED BUDGET (in Taka):
- OPERATIONAL EXPENSES:200,000   
- CAPITAL EXPENSES:300,000   
 
- TOTAL:500,000   
PROJECT TITLE:Digestibility of protein by different cultivated fish speciesCODE: D-02
   
STATION OF EXECUTION:FARS, Mymensingh 
   
PROGRAMME:Fish feed and nutrition 
   
RESEARCH AREA(S): CODE(S):
- Nutrition and feed 10-02/10-05

OBJECTIVES:

  1. determination of the digestibility of protein sources of different origin by various cultivated fish species;
  2. determination of the optimimum and most economic plant/animal protein ratio for different cultivated fish species.
TIME SCHEDULE:
- DATE OF COMMENCEMENT:01.02.1987   
- DATE OF COMPLETION:31.01.1990   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 111
- NO OF SUPPORTING STAFF: 222
    
ESTIMATED BUDGET (in Taka):
- OPERATIONAL EXPENSES:410,000   
- CAPITAL EXPENSES:210,000   
 
- TOTAL:620,000   
PROJECT TITLE:Development of fish feeds for different cultivated speciesCODE: D-03
   
STATION OF EXECUTION:FARS, Mymensingh 
   
PROGRAMME:Fish feed and nutrition 
   
RESEARCH AREA(S): CODE(S):  
- Nutrition and feed 10-03/10-06
- Processing 13-02

OBJECTIVES:

  1. formulation and preparation of feeds for larvae, fry, fingerlings, and foodfish of different species, using indigenous raw materials, based on their biochemical composition and availability;
  2. recommendation of guidelines for the storage of manufactured fish feeds on the basis of their shelf life;
  3. extension of feed technology.
TIME SCHEDULE:
- DATE OF COMMENCEMENT:01.09.1987   
- DATE OF COMPLETION:30.08.1990   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 111111
- NO OF SUPPORTING STAFF: 101010
    
ESTIMATED BUDGET (in Taka):   
- OPERATIONAL EXPENSES:1,510,000   
- CAPITAL EXPENSES:3,770,000   
 
- TOTAL:5,280,000   
PROJECT TITLE:Country-wide survey of common fish diseases and parasitesCODE: E-01
   
STATION OF EXECUTION:FARS, Mymensingh 
   
PROGRAMME:Fish pathology 
   
RESEARCH AREA(S): CODE(S):    
- Health care of freshwater species12-01

OBJECTIVES:

  1. identification of the diseases of commercially important species of fish in the country;
  2. identification of the parasites occurring in the commercially important species of fish, their intensity of infection, and their economic damage;
  3. identification of environmental factors that lead to infection of fishes;
  4. provision of diagnostic services to fish farmers.
TIME SCHEDULE:
- DATE OF COMMENCEMENT:01.05.1987   
- DATE OF COMPLETION:30.04.1989   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 11-
- NO OF SUPPORTING STAFF: 111
   
ESTIMATED BUDGET (in Taka):
- OPERATIONAL EXPENSES:500,000   
- CAPITAL EXPENSES:150,000   
 
- TOTAL:650,000   
PROJECT TITLE:Effects and use of locally available drugs/chemicals for controlling fish parasites and diseasesCODE: E-02
   
STATION OF EXECUTION:FARS, Mymensingh 
   
PROGRAMME:Fish pathology 
   
RESEARCH AREA(S): CODE(S):    
- Health care of freshwater species12-02
- Socio-economics 14-04

OBJECTIVES:

  1. identification of locally available drugs/chemicals that could cure/control diseases and parasites of fishes;
  2. determination of dosages of drugs/chemicals needed for treating individual fish, and for treatment in ponds;
  3. preparation of extension pamphlets for dissemination of first-line health care information.
TIME SCHEDULE:
- DATE OF COMMENCEMENT:01.01.1988   
- DATE OF COMPLETION:31.12.1989   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 11-
- NO OF SUPPORTING STAFF: 11-
   
ESTIMATED BUDGET (in Taka):
- OPERATIONAL EXPENSES:450,000   
- CAPITAL EXPENSES:200,000   
 
- TOTAL:650,000   
PROJECT TITLE:Benchmark survey of water bodies for culture and capture fisheries, their problems and potentialCODE: F-01
   
STATION OF EXECUTION:FARS, Mymensingh 
   
PROGRAMME:Socio-economic studies 
   
RESEARCH AREA(S): CODE(S):      
- Socio-economics 14-02/14-06/14-08

OBJECTIVES:

  1. study of the present status of fish culture in closed waters and of capture fisheries in open inland waters;
  2. identification of the constraints for increasing production facing the industry;
  3. estimate of the future potential of these water bodies when the constraints are taken care of;
  4. preparation of recommendations to the Government to overcome the constraints facing the industry.
TIME SCHEDULE:
- DATE OF COMMENCEMENT:01.03.1987   
- DATE OF COMPLETION:28.02.1989   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 11-
- NO OF SUPPORTING STAFF: 11-
   
ESTIMATED BUDGET (in Taka):
- OPERATIONAL EXPENSES:200,000   
- CAPITAL EXPENSES:20,000   
 
- TOTAL:220,000   
PROJECT TITLE:Marketing practices for fisheries productsCODE: F-02
   
STATION OF EXECUTION:FARS, Mymensingh 
   
PROGRAMME:Socio-economic studies 
   
RESEARCH AREA(S): CODE(S):      
- Socio-economics 14-02/14-08
- Processing 13-03

OBJECTIVES:

  1. study of the existing marketing practices for shellfish and finfish from culture and capture fisheries;
  2. identification of the problems faced by persons involved at different levels in the marketing chain;
  3. recommendation of appropriate marketing procedures to the Government for getting maximum benefit to the producers.
TIME SCHEDULE:
- DATE OF COMMENCEMENT:01.01.1988   
- DATE OF COMPLETION:31.12.1988   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 1--
- NO OF SUPPORTING STAFF: ---
   
ESTIMATED BUDGET (in Taka):
- OPERATIONAL EXPENSES:100,000   
- CAPITAL EXPENSES:          -   
 
- TOTAL:100,000   
PROJECT TITLE:Financial feasibility and social cost analysis of aquaculture practicesCODE: F-03
   
STATION OF EXECUTION:FARS, Mymensingh 
   
PROGRAMME:Socio-economic studies 
   
RESEARCH AREA(S): CODE(S):      
- Socio-economics14-01/14-02/14-07/14-09

OBJECTIVES:

  1. analysis of the cost-benefit ratio of different aquaculture practices - extensive, semi-intensive and intensive - both for fish and shrimp;
  2. study of the social aspects involved in the introduction of modern aquaculture practices;
  3. recommendation, based on the results of above studies, to the Government of those aquaculture practices, that could give optimum financial and social benefits to the people.
TIME SCHEDULE:
- DATE OF COMMENCEMENT:01.01.1988   
- DATE OF COMPLETION:31.03.1989   
     
MANPOWER: YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 11-
- NO OF SUPPORTING STAFF: ---
   
ESTIMATED BUDGET (in Taka):
- OPERATIONAL EXPENSES:100,000   
- CAPITAL EXPENSES:10,000   
 
- TOTAL:110,000   
PROJECT TITLE:Evaluation Tank Enforcement ActCODE: F-04
   
STATION OF EXECUTION:FARS, Mymensingh 
   
PROGRAMME:Socio-economic studies 
   
RESEARCH AREA(S):      CODE(S):
- Socio-economics 14-03/14-08

OBJECTIVES:

  1. determination of the effects of enforcement of the Tank Enforcement Act on the ue of derelict/non-used ponds;
  2. preparation of recommendations to the Government for improvement of the situation, if needed.
TIME SCHEDULE:
- DATE OF COMMENCEMENT:01.01.1988   
- DATE OF COMPLETION:31.12.1988   
   
MANPOWER:YEAR 1YEAR 2YEAR 3
- NO OF RESEARCHERS: 1--
- NO OF SUPPORTING STAFF: ---
   
ESTIMATED BUDGET (in Taka):
- OPERATIONAL EXPENSES:100,000   
- CAPITAL EXPENSES:          -   
 
- TOTAL:100,000   