The vessels itinerary was as follows:
Entering Guatemalan waters 11 SeptemberDuring 4 days of work in Guatemalan waters the vessel steamed abt. 600 nm and 34 fishing stations were worked. In the Gulf of Tehuantepec the total distance steamed during 5.5 days of work was abt. 1 000 nm with 42 trawl stations. Hydrographic profiles were worked off Champerico, San Marcos and Salina Cruz.
Call Puerto Quetzal 12-13 September
Arrival Puerto Quetzal 23 September.
Figure 1 shows the course tracks followed and the positions of the hydrographic profiles and the fishing stations.
The weather conditions were favourable and did not limit the work.