6. PRODUCTION

6.1. Felling operation

6.2. Logging operation

Work phases Total

Total work phases 100.00 % 95.99 %

Delays

Sequence of operation delays 44.14 % 1.77 %

Total delays 100.00 % 4.01 %

Grand total 100.00 %

Equipment delays

6.3. Processing operation

Production [m3/h]

- - -- Assortment method - short --- Assortment method - long

Figure 4. Performance of the STEYR KP 40 wood processor (FPP 1991).

FPP (Kooperationsabkommen Forst - Platte - Papier) (1991): HARVESTER / PROZESSOREN,

Maschinen in der Durchforstung, Einsatzmöglichkeiten - Verfahren, Leistung - Kosten; Wien; p. 32