6. SUMMARY OF ESTIMATED CONSTRUCTION AND EQUIPMENT COSTS

The following estimates include capital expenses, but exclude cost of operation and maintenance. A 20 percent allowance for inflation has been included in the estimates.

  U.S.$
Pond and hatchery construction  
 Ponds64 730 
 Hatchery33 50098 230
Construction of station buildings  
 Administration building, stores, workshop, laboratories361 830 
 Staff residences292 500 
 Hostel135 000789 330
Equipment and supplies 384 754
 Grand total1 272 314