RAS HAIYAN FEASIBILITY STUDY - ENGINEERING TASKS LISTING
September 1983

TOPOGRAPHY

Survey completed

SOILS

Design soils testing programme
Take soil samples
Laboratory analysis
Soils evaluation, foundation analysis

PLANNING

Develop master plan for pilot aquaculture project, Phase I
Locate existing construction and road work
Locate water supply and drainage features

POND DESIGN

Determine design criteria - biological and engineering
Decide on location
Prepare preliminary designs
Materials and alternatives study
Preliminary cost estimates
Final design and cost estimates

WATER SUPPLY AND WASTE DISPOSAL

Consult with hydrologists and agriculture engineers on groundwater and shoreline conditions
Evaluate saltwater source alternatives
Develop water quantity requirements
Drill test well or sink caisson
Develop waste water requirements
Prepare preliminary designs
Materials and alternatives study
Preliminary and cost estimates
Final design and cost estimates

CONTRACT DOCUMENTS

Final construction drawings
Final construction specifications
Construction cost estimates and project schedule

ENGINEERING SCHEDULE, 1 TO 30 SEPTEMBER 1983