The following unit costs were utilized during the assessment of the grow-out feasibility of freshwater prawn farming in Sindh province, Pakistan (Appendix 5) and in the construction and operating estimates derived for the establishment of a government freshwater prawn farming hatchery and demonstration farm there (Appendix 7) for TCP/PAK/4559.
The information contained in this appendix has been derived from data obtained during the field mission to Pakistan in December 1995. For each item, examples of past or current costs are provided, together with the derived unit cost used in Appendix 7. The information is presented in six tables:
Table 1 - Land and Buildings
Table 2 - Pond and Tank Construction
Table 3 - Equipment
Table 4 - Pond Maintenance
Table 5 - Feeds, Fertilizers and Chemicals
Table 6 - Office Supplies and Repairs
Table 7 - Staff and Labour
An exchange rate of $US 1.00 = PRs 34.25 has been applied
Table 1
LAND AND BUILDINGS
Item | Source | Cost (PRs) |
Land and land development (2 acres) | PARC PC-1 1995 | 500 000 |
LAND COSTS USED IN THIS STUDY (existing sites): Nil | ||
Three houses totalling | ||
4 000 ft2(1 officer, 2 staff) | PARC PC-1 1995 | 2000 000 |
House for GOS Grade 5–10 | Badin PC-1 1994 | 252 016 |
House for GOS Grade 1–4 | Badin PC-1 1994 | 213 872 |
HOUSING ALLOWANCE USED IN THIS STUDY (three staff houses): | 1000 000 | |
Office with three rooms | ||
(990 ft2) | Badin PC-1 1994 | 361 242 |
Office (1 012 ft2) | PARC PC-1 1995 | 506 000 |
OFFICE ALLOWANCE USED IN THIS STUDY: | 400 000 | |
Hatchery (2 000 ft2) | PARC PC-1 1995 | 1000 000 |
HATCHERY BUILDING ALLOWANCE USED IN THIS STUDY: | 1 200 000 |
Table 2
POND AND TANK CONSTRUCTION
Item | Source and Date | Cost (PRs) | |
Pond construction, including inlets/outlets: | |||
0.2 ha | GOS | 1995 | 14 000 |
0.4 ha | Badin PC-1 | 1994 | 73 800 |
0.4 ha | PARC PC-1 | 1995 | 100 000 |
0.8 ha | AQUA | 1991? | 60 000 |
1.0 ha | GOS | 1994 | 53 200 |
1.0 ha | AQUA | 1991? | 65 000 |
1.4 ha (brooder; 8 ft deep) | Badin PC-1 | 1994 | 393 000 |
2.0 ha | AQUA | 1991? | 135 000 |
POND CONSTRUCTION ALLOWANCES USED IN THIS STUDY: | |||
0.2 ha | 1996 | 50 000 | |
0.5 ha | 1996 | 88 000 | |
1.0 ha | 1996 | 125 000 | |
Tank construction or purchase: | |||
0.2 m3 Fibreglass artemia | PARC PC-1 | 1995 | 3000 |
1.0 m3 Fibreglass circular | Badin PC-1 | 1994 | 2 500 |
2.0 m3 Fibreglass larval | PARC PC-1 | 1995 | 15 000 |
3.3 m3 RCC circular | Badin PC-1 | 1994 | 10 164 |
6.8 m3 RCC rectangular, with shower | Badin PC-1 | 1994 | 18 000 |
106 m3 RCC nursery | Badin PC-1 | 1994 | 234 375 |
227 m3 RCC overhead | Badin PC-1 | 1994 | 150 000 |
TANK CONSTRUCTION/PURCHASE ALLOWANCES USED IN THIS STUDY:
0.2 m3 artemia | 1996 | 4000 |
0.5 m3 phase-I filter | 1996 | 7000 |
1.0 m3 broodstock and phase-I larval | 1996 | 10 000 |
1.5 m3 phase-II filter | 1996 | 13 000 |
3.0 m3 phase-II larval | 1996 | 19 000 |
5.0 m3 s/w and b/w | 1996 | 24 000 |
10.0 m3 f/w | 1996 | 27 000 |
25.0 m3 postlarval | 1996 | 60 000 |
Tubewell | PARC PC-1 1995 | 1000 000 |
WELL COST ALLOWANCE USED IN THIS STUDY: | 1000 000 |
Table 3
EQUIPMENT
Item and size/type | Source and date | Cost (PRs) | |
Generators | |||
4 Kv | GOS | 1995 | 60 000 |
5 Kv | GOS | 1995 | 110 000 |
n.s. | Badin PC-1 | 1994 | 50 000 |
n.s. | PARC PC-1 | 1995 | 30 000 |
ALLOWANCE THIS STUDY (two): | 1996 | 70 000 | |
Refrigerators | |||
6.5 ft3 | GOS | 1995 | 14 500 |
8.0 ft3 | GOS | 1995 | 18 000 |
8.0 ft3 | GOS | 1995 | 18 200 |
10.0 ft3 | GOS | 1995 | 20 000 |
10.0 ft3 | GOS | 1995 | 20 100 |
n.s. | PARC PC-1 | 1995 | 20 000 |
deep freeze | Badin PC-1 | 1994 | 20 000 |
deep freeze | PARC PC-1 | 1995 | 25 000 |
ALLOWANCE THIS STUDY | |||
(one fridge/freezer): | 1996 | 30 000 | |
Pumps | |||
2 HP/25 GPM | GOS | 1995 | 6000 |
5 HP/200 GPM | GOS | 1995 | 10 000 |
n.s. (lot) | PARC PC-1 | 1995 | 50 000 |
n.s. (lot. with plumbing) | Badin PC-1 | 1994 | 20 000 |
Portable | Badin PC-1 | 1994 | 8 000 |
ALLOWANCE THIS STUDY | |||
(lot: pumps/plumbing for hatchery): | 1996 | 200 000 | |
Rotary air blowers | |||
5 HP | GOS | 1995 | 65 000 |
n.s. | PARC PC-1 | 1995 | 25 000 |
ALLOWANCE THIS STUDY (two): | 1996 | 60 000 | |
Microscopes | |||
Dissecting | Badin PC-1 | 1994 | 5000 |
Compound | Badin PC-1 | 1994 | 6 000 |
Compound | PARC PC-1 | 1995 | 50 000 |
Stereo | PARC PC-1 | 1995 | 50 000 |
ALLOWANCE THIS STUDY (lot): | 1996 | 75 000 | |
Vehicles | |||
4 WD double cabin | GOS | 1995 | 1 500 000 |
Pickup double cabin | PARC PC-1 | 1995 | 1000 000 |
n.s. | GOS | 1994 | 1 000 000 |
Bowser (size n.s.) | PARC PC-1 | 1995 | 1 500 000 |
Bowser (size n.s.) | GOS | 1995 | 1 800 000 |
ALLOWANCE THIS STUDY (lot): | 1996 | 3 000 000 | |
Nets | |||
30 m × 1 m seine | GOS | 1995 | 20 000 |
dip | Badin PC-1 | 1994 | 500 |
plankton (lot) | Badin PC-1 | 1994 | 25 000 |
pond (lot) | Badin PC-1 | 1994 | 150 000 |
(lot) | PARC PC-1 | 1995 | 100 000 |
ALLOWANCE THIS STUDY (lot): | 1996 | 125 000 | |
Refractometer n.s. | PARC PC-1 | 1995 | 15 000 |
Refractometer n.s. | GOS | 1995 | 4000 |
Secchi Disk | PARC PC-1 | 1995 | 1000 |
Homogenizer Kitchen | GOS | 1995 | 5000 |
Haemocytometer n.s. | PARC PC-1 | 1995 | 3000 |
ALLOWANCE THIS STUDY: (one each: refractometer, Secchi disk, haemocytometer, homogenizer): | 1996 | 25 000 | |
pH meters Portable | GOS | 1995 | 7000 |
n.s. | Badin PC-1 | 1994 | 5000 |
n.s. | PARC PC-1 | 1995 | 15 000 |
DO2 meter n.s. | GOS | 1995 | 25 000 |
Hach kit, water quality | PARC PC-1 | 1995 | 25 000 |
ALLOWANCE THIS STUDY: (one each of pH meter, DO2 meter, Hach kit): | 1996 | 75 000 | |
Airconditioner n.s. | PARC PC-1 | 1995 | 20 000 |
ALLOWANCE THIS STUDY two): | 1996 | 40 000 | |
UV treatment unit n.s. | PARC PC-1 | 1995 | 100 000 |
ALLOWANCE THIS STUDY (one): | 1996 | 100 000 | |
Balances | |||
1 kg × 0.1 g electronic | GOS | 1995 | 50 000 |
analytical (beam) | Badin PC-1 | 1994 | 2 000 |
(lot) | PARC PC-1 | 1995 | 25 000 |
ALLOWANCE THIS STUDY (lot): | 1996 | 60 000 | |
Oxygen cylinder | |||
n.s. | Badin PC-1 | 1994 | 5 000 |
with accessories | PARC PC-1 | 1995 | 15 000 |
ALLOWANCE THIS STUDY (lot): | 1996 | 10 000 | |
Laboratory equipment | |||
(sundry glassware, etc.; lot) | Badin PC-1 | 1994 | 30 000 |
(sundry; lot) | MFD PC-1 | 1995 | 700 000 |
ALLOWANCE THIS STUDY (lot): | 1996 | 120 000 |
Table 4
POND MAINTENANCE
Item | Source and date | Cost (PRs) | ||
Pond operating costs preparation, weeding, pumping, rewatering, and miscellaneous: | ||||
0.8 ha | AQUA | 1991? | 4 700 | |
2.0 ha | AQUA | 1991? | 12 750 | |
water charges: 2.0 ha | GOS | 1994 | 4 075 | |
initial water supply: 1 ha | GOS | 1994 | 4 800 | |
water exchange: 1 ha | GOS | 1994 | 13 000 | |
ALLOWANCE THIS STUDY (water costs): | 1996 | 19 000/ha | ||
Transportation/fuel | ||||
(annual allowance) | Badin PC-1 | 1994 | 20 000 | |
(annual allowance) | PARC PC-1 | 1995 | 75 000 | |
ALLOWANCE THIS STUDY: | 1996 | 80 000 | ||
Harvesting costs 1 ha carp farm GOS | 1994 | 12 000 | ||
2 ha fish farm GOS | 1994 | 5000 | ||
ALLOWANCE THIS STUDY: | 1996 | 14 000 | ||
Miscellaneous charges | ||||
1 ha farm | AQUA | 1991(?) | 600 | |
2 ha farm | GOS | 1994 | 9 250 | |
ALLOWANCE THIS STUDY: | 1996 | 5 000 |
Table 5
FEEDS, FERTILIZERS AND CHEMICALS
Item | Source and date | Cost (PRs) | |
Fertilizers | |||
Urea | GOS | 1995 | 6 800/t |
Triple super phosphate (TSP) | GOS | 1995 | 7 880/t |
Di-ammonium phosphate (DAP) | GOS | 1995 | 9 260/t |
Cow dung | GOS | 1995 | 950/t |
Poultry manure | GOS | 1995 | 900/t |
ALLOWANCE THIS STUDY | |||
(total fertilizer cost/ha): | 1996 | 7000 | |
Lime | GOS | 1995 | 3 000/t |
ALLOWANCE THIS STUDY | |||
(lime cost/ha): | 1996 | 3000 | |
Bleach | GOS | 1995 | 40/kg |
ALLOWANCE THIS STUDY: | 1996 | 40/kg | |
Feeds and feed ingredients | |||
for grow-out: | |||
Rice bran (type n.s.) | GOS | 1995 | 5 500/t |
Mustard oil cake | GOS | 1995 | 7 500/t |
Fish meal | GOS | 1995 | 18 000/t |
Compound poultry feed | |||
(type n.s.) | GOS | 1995 | 10 000/t |
Ingredient cost for carp feed | |||
(derived this study) | - | 1995 | 6 500/t |
ALLOWANCE THIS STUDY | |||
(Freshwater prawn compound feed): | 1996 | 12 000/t | |
For hatchery: Artemia eggs (type n.s.) | GOS | 1995 | 6 612/kg |
Artemia eggs (type n.s.) | PARC PC-1 | 1995 | 10 000/kg |
ALLOWANCE THIS STUDY (Artemia): | 1996 | 9 000/kg | |
Chicken eggs (retail) | GOS | 1995 | 30/dozen |
Chicken eggs (wholesale) | Market | 1995 | 25/dozen |
Milk powder (full cream baby) | GOS | 1995 | 192–320/kg |
Mussels (fresh, whole) | GOS | 1995 | 50/kg |
Trash fish | GOS | 1995 | 5/kg |
LIBERAL ALLOWANCE THIS STUDY (Prepared feed): | 1996 | 1 000/kg |
Table 6
OFFICE SUPPLIES AND REPAIRS
Item | Source and date | Cost (PRs) | ||
Photocopier | PARC PC-1 | 1995 | 75 000 | |
ALLOWANCE THIS STUDY: | 1996 | 50 000 | ||
Office furniture (lot) | Badin PC-1 | 1994 | 50 000 | |
(lot) | PARC PC-1 | 1995 | 300 000 | |
ALLOWANCE THIS STUDY: | 1996 | 200 000 | ||
Computer (type n.s.) | PARC PC-1 | 1995 | 100 000 | |
Typewriter (type n.s.) | PARC PC-1 | 1995 | 25 000 | |
Calculator (type n.s.) | PARC PC-1 | 1995 | 1000 | |
ALLOWANCE THIS STUDY: | 1996 | 225 000 | ||
Office stationery | MFD PC-1 | 1995 | 25 000/yr | |
Office stationery | Badin PC-1 | 1994 | 20 000/yr | |
Books & periodicals | Badin PC-1 | 1994 | 10 000/yr | |
Books, periodicals & printing | MFD PC-1 | 1995 | 125 000/yr | |
ALLOWANCE THIS STUDY | ||||
(stationery and books): | 1996 | 50 000/yr | ||
Badin PC-1 | 1994 | 1 500/yr | ||
Communications | PARC PC-1 | 1995 | 50 000/yr | |
“Hot & Cold charges, POL and taxes | Badin PC-1 | 1994 | 55 500/yr | |
“TA & POL” | MFD PC-1 | 1995 | 200 000/yr | |
Telephone | PARC PC-1 | 1995 | 25 000/yr | |
Telephone rental | Badin PC-1 | 1994 | 20 000/yr | |
Telephone installation | Badin PC-1 | 1994 | 5000 | |
Communications | MFD PC-1 | 1995 | 50 000/yr | |
ALLOWANCE THIS STUDY | ||||
(various utility and tax costs): | 1996 | 150 000/yr | ||
Contingencies (whole hatchery) | Badin PC-1 | 1994 | 35 000/yr | |
(whole hatchery) | MFD PC-1 | 1995 | 50 000/yr | |
ALLOWANCE THIS STUDY: | 1996 | 80 000/yr | ||
Repairs & maintenance | ||||
(whole hatchery) | PARC PC-1 | 1995 | 100 000/yr | |
ALLOWANCE THIS STUDY: | 1996 | 100 000/yr |
Table 7
UNIT STAFF AND LABOUR COSTS USED IN THIS STUDY
Type | Grade | Total salary/ allowances* (PRs/year) |
Deputy Director | 18 | 80 000 |
Assistant Director | 17 | 60 000 |
Accountant | 17 | 60 000 |
Senior Research Assistant | 12 | 30 000 |
Assistant | 11 | 30 000 |
Research Assistant | 10 | 22 000 |
Driver | 4 | 24 000 |
Laboratory Assistant | 3 | 23 000 |
Cleaner, Peon or Chowkidar | 1 | 22 000 |
Labourer (private, per hectare) | - | 18 000 |
Sources: Derived from (a) PARC pay scales; (b) MFD pay scales; (c) GOS 1995.